Laserfiche WebLink
STANDARD PROVISIONS AND REPORTING REQUIREMENTS,JANUARY 2012 - 14- <br /> FOR WASTE DISCHARGE REQUIREMENTS <br /> FOR DISCHARGES REGULATED BY SUBTITLE D AND/OR TITLE 27 <br /> structures, and monitoring facilities can be determined throughout the <br /> post-closure maintenance period [Title 27, § 20950(d)]. <br /> 19.Following closure of any MSW landfill units, the Discharger shall notify the <br /> Executive Officer that the deed to the landfill facility property, or some other <br /> instrument that is normally examined during a title search, has been recorded <br /> and a copy placed in the operating record. The notation on the deed shall in <br /> perpetuity notify any potential purchaser of the property that the land has been <br /> used as a landfill facility and that use of the land is restricted to the planned use <br /> described in the post-closure maintenance plan [Title 27, § 20515(a)(4) and <br /> §21170, and 40 C.F.R. § 258.60(i)]. <br /> 20.Construction or repair of the final cover system's low-hydraulic conductivity layer <br /> is to be carried out in accordance with an approved construction quality <br /> assurance plan [Title 27, § 21090(b)(1)(E)]. <br /> 21.The Discharger shall incorporate into the closure and post-closure maintenance <br /> plan a cover-integrity monitoring and maintenance program which includes at <br /> least the following: a periodic leak search, periodic identification of other <br /> problem areas, prompt cover repair, and vegetation maintenance <br /> [Title 27, § 21090(a)(4)]. <br /> 22.The Discharger shall complete a final cover survey upon completion of closure <br /> activities for that portion of the landfill. The final cover surveys shall include an <br /> initial survey and map [Title 27, § 21090(e)(1). Every five years, the Discharger <br /> shall conduct a survey of the closed landfill cover and submit an iso-settlement <br /> map accurately depicting the estimated total change in elevation of each portion <br /> of the final cover's low-hydraulic-conductivity layer [Title 27, § 21090(e)(2)]. <br /> 23.Within 30 days of completion of all closure activities, the Discharger shall certify <br /> that all closure activities were performed in accordance with the most recently <br /> approved final closure plan and CQA Plan, and in accordance with all applicable <br /> regulations. The Discharger shall also certify that closed landfill units shall be <br /> maintained in accordance with and approved post-closure maintenance plan <br /> [Title 27, § 21710(c)(6)]. <br /> 24.Within 180 days of completion of closure construction activities, the Discharger <br /> shall submit final documentation of closure, including the Certification of <br /> Closure. The closure documents shall include a final construction quality <br /> assurance report and any other documents necessary to support the <br /> certification [Title 27, § 218801. <br /> 25.The post-closure maintenance period shall continue until the Central Valley <br /> Water Board determines that wastes remaining in the landfill unit(s) no longer <br /> pose a threat to water quality [Title 27, § 20950(a)(1)]. <br />