Laserfiche WebLink
STANDARD PROVISIONS AND REPORTING REQUIREMENTS,JANUARY 2012 -24- <br /> FOR WASTE DISCHARGE REQUIREMENTS <br /> FOR DISCHARGES REGULATED BY SUBTITLE D AND/OR TITLE 27 <br /> b. Retest Method [Title 27, § 20415(e)(8)(E) and § 204200)(1-3)]. <br /> 1) In the event that the Discharger or Central Valley Water Board staff <br /> concludes (pursuant to paragraph 1.47.a., above) that there is a <br /> preliminary indication of a release, then the Discharger shall immediately <br /> notify Central Valley Water Board staff by phone or e-mail and, within 30 <br /> days [Title 27, § 20415(e)(3)] of such indication, the Discharger shall <br /> implement a verification procedure/retest option, in accordance with <br /> Title 27, sections 20415(e)(8)(E) and 204200)(2). The verification <br /> procedure shall include either a single "composite" retest (i.e., a statistical <br /> analysis that augments and reanalyzes the data from the monitoring point <br /> that indicated a release) or shall consist of at least two "discrete" retests <br /> (i.e., statistical analyses each of which analyzes only newly-acquired data <br /> from the monitoring point that indicated a release) [Title 27, <br /> § 20415(e)(8)(E)]. The Discharger may use an alternate method <br /> previously approved by the Central Valley Water Board and included in <br /> the Monitoring and Reporting Program. The verification procedure shall <br /> comply with the requirements of Title 27, section 20415(e)(8)(E) in <br /> addition to the performance standards of Title 27, section 20415(e)(9). <br /> The retest samples shall be collected from the monitoring point where the <br /> release is preliminarily indicated and shall be analyzed for the <br /> constituents that caused the need for the retest. For any indicated <br /> monitoring parameter or constituent of concern, if the retest results of one <br /> or more of the retest data suites confirm the original indication, the <br /> Discharger shall conclude that measurably significant evidence of a <br /> release has been confirmed. <br /> 2) Confirmation of a Release. As soon as the retest data are available, <br /> the Discharger shall evaluate the results pursuant to paragraph 1.47.b.1, <br /> above and shall: <br /> a) Immediately verbally notify the Central Valley Water Board whether <br /> or not the retest confirmed measurably significant evidence of a <br /> release for the analyte at the monitoring point, and follow up with <br /> written notification submitted by certified mail within seven days of <br /> the verbal notification; and <br /> b) Carry out the requirements of Section J, RESPONSE TO A <br /> RELEASE if a release has been confirmed. <br /> c) Add any five-year analyte that is confirmed per this method to the <br /> monitoring parameter list such that it is monitored during each regular <br /> monitoring event. <br /> 48.Physical Evidence of a Release. If the Discharger determines that there is a <br /> significant physical evidence of a release, the Discharger shall immediately <br />