Laserfiche WebLink
i <br /> FORWARD COMPOSTING FACILITY <br /> REPORT OF COMPOSTING SITE INFORMATION <br /> TABLE OF CONTENTS <br /> 1.0 FACILITY OVERVIEW...........................................................................................................1-1 <br /> 1.1 Introduction.........................................................................................................1-1 <br /> 1.2 Site Location .......................................................................................................1-2 <br /> 1.2.1 Site Location Map................................................................................1-2 <br /> 1.2.2 Site Facilities/Features.......................................................................1-2 <br /> 1.2.3 Surrounding Land Use.........................................................................1-3 <br /> 1.3 Quantity of Materials to be Accepted................................................................1-4 <br /> 1.3.1 Maximum Daily Load Capacity............................................................1-5 <br /> 1.3.2 Average Daily Throughput...................................................................1-5 <br /> 1.3.3 Average Load Capacity Next Five Years.............................................1-6 <br /> 1.3.4 Design Capacity...................................................................................1-6 <br /> 1.3.5 Feedstock Material Types ...................................................................1-6 <br /> 1.4 Types and Numbers of Vehicles Anticipated to Enter the Facility...................1-6 <br /> 2.0 COMPOST PROCESSING SITE DESIGN, MONITORING, AND SITE IMPROVEMENTS......2-1 <br /> 2.1 Composting Site Design .....................................................................................2-1 <br /> 2.1.1 Site Plan ...............................................................................................2-1 <br /> 2.1.2 Design Details......................................................................................2-3 <br /> 2.1.3 Facility Construction ............................................................................2-5 <br /> 2.1.4 Grading and Drainage Plan.................................................................2-6 <br /> 2.1.5 Pad Composition and Dimensions .....................................................2-7 <br /> 2.1.6 Drainage Control..................................................................................2-7 <br /> 2.1.7 Leachate Control..................................................................................2-8 <br /> 2.1.8 Site Access...........................................................................................2-9 <br /> 2.1.9 Development Stages ...........................................................................2-9 <br /> 2.1.10 Amendments and Additives................................................................2-9 <br /> 2.1.11 Physical Site Conditions Report........................................................2-10 <br /> 2.2 Monitoring.........................................................................................................2-13 <br /> 2.3 Composting Site Improvements.......................................................................2-14 <br /> 2.3.1 Identification Signs............................................................................2-14 <br /> 2.3.2 Entry Signs..........................................................................................2-15 <br /> • 2.3.3 Facility Security..................................................................................2-15 <br /> Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information - November 2014 <br /> z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\resi 2014\tent\resi toc.doc <br />