My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2014_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0517379
>
ARCHIVED REPORTS_2014_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:27:23 PM
Creation date
7/3/2020 11:20:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2014_1
RECORD_ID
PR0517379
PE
4466
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
02
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4466_PR0517379_9999 S AUSTIN_2014_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-7 <br /> 3.4.4 Load Checking <br /> As also discussed in Section 3.4.1, incoming loads are inspected upon entrance at the <br /> facility in accordance with the Load Checking Program. Load checks of feedstocks are <br /> performed at the material sorting area as required by 14 CCR, Section 17867(a)(3). In <br /> addition, incoming loads are also checked for hazardous or prohibited materials at the <br /> facility. The number of load checks performed and loads rejected will be documented by <br /> facility personnel in accordance with 14 CCR, Section 17869(e). Load check records are <br /> maintained at the RRF/Compost Facility office. <br /> 3.5 Processing Operations <br /> 3.5.1 Development Stages <br /> The Compost Facility will be developed dependent on availability of suitable compostable <br /> materials and equipment capability. The amount of material that is processed depends on <br /> potential composting technologies. Forward has designed the Compost Facility with the <br /> flexibility to expand its processing capability as the volume of incoming materials increases. <br /> Figure 2 shows the site development areas. Project development stages are also discussed <br /> in Section 2.1.9. <br /> 3.5.2 Type of Operations <br /> The Compost Facility uses the Windrow composting method turned by a Windrow machine. <br /> The facility operations are further described in the following sections. The amounts of waste <br /> received are described in detail in Section 1.3. <br /> a. Waste Handling and Separation <br /> Vehicles delivering green waste material that has been preprocessed (ground) prior to <br /> arriving at the Compost Facility or materials that do not need processing will be directed to a <br /> separate unloading area to bypass grinding operations. Compost Facility personnel will <br /> direct vehicles and supervise the unloading operations. Limited material sorting is <br /> conducted as discussed below only as part of the composting operation. <br /> After the materials are unloaded, laborers will remove unacceptable wastes such as plastic <br /> bags and miscellaneous pieces of mixed waste. Loads of material that have been <br /> processed prior to arriving at the Compost Facility will be visually inspected to ensure that <br /> contaminants are removed prior to composting. In addition, large concentrations of wastes <br /> (and difficult to process materials), which may be difficult to process or compost, are <br /> segregated and routed for disposal. Difficult-to-process materials include palm and other <br /> vine like materials, which can cause increased equipment maintenance and downtime; and <br /> eucalyptus, straw, and redwood, which take a long time to decompose and may contain <br /> phytotoxic components. Should any treated wood waste (TWW) be inadvertently delivered to <br /> the composting facility, Republic personnel will remove the TWW and dispose of it at the <br /> Forward Landfill in accordance with WDR Order No. R5-2014-0006. Additionally, any other <br /> unacceptable non-hazardous wastes and large concentrations of difficult materials are <br /> placed in MSW bins and transferred to the landfill's working face for disposal. <br /> After personnel have removed unacceptable and/or difficult materials and large wood <br /> objects from the waste which requires grinding, a front end loader will feed the waste into <br /> the grinder or move the material within reach of a grapple that will load the grinder. The <br /> grinder will shred the material into pieces with a nominal size of approximately 3 to 6 inches. <br /> Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information-November 2014 <br /> z:\prcjects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\resi 2014\text\9-nov 2014 track changes\sec 3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.