Laserfiche WebLink
iv <br /> FIGURES <br /> Figure 1: Vicinity Map and Site Location Map <br /> Figure 2: Site Plan <br /> Figure 3: 1,000 ft Radius/Adjacent Land Use Map <br /> Figure 4: Windrow Machine Turned <br /> Figure 5: Traffic Flow Plan <br /> Figure 6: Grading and Drainage Plan and Earthwork Sections <br /> Figure 7: Isohyetal Map <br /> Figure 8: Flood Plain Map <br /> Figure 9: Wind Rose <br /> APPENDICES <br /> Appendix A: Operating Permits and Approvals <br /> Appendix B: Design Calculations <br /> Appendix C: Runoff Calculations <br /> Appendix D: Management Resumes <br /> Appendix E: Vector Control Plan (2014) <br /> Appendix E-1: Odor Impact Minimization Plan (SWT, 2014) <br /> Appendix E-2: Litter Management Plan (2014) <br /> Forward Composting Facility SWT Engineering <br /> Report of Composting Site Information - November 2014 <br /> z:\projects\allied waste\forward\resource recovery facility\5 yr permit rvw 2013-14\resi 2014\text\resi toc.doc <br />