Laserfiche WebLink
Site Map Site Photo <br /> Operation Plan and Details of Project Operation Plan and Details of Project <br /> • Closest structures and dwellings Duration of Disposal-June through October <br /> -Several homes are 2/3 of a mile to the west Type of Waste-Peach and Tomato Cannery <br /> -Landfill scale house is 1/3 of a mile to the Waste consisting of whole fruits,vines,pumice, <br /> northeast. culls,leaves,and rinse eater. <br /> Transfer Station office is 1/3 ol'a mile to the Quantity of Waste-up to 300 tons per day(5 tons <br /> cast. per acre per day). <br /> Operation Plan and Details of Project Operation Plan and Details of Project <br /> • Site Security Contingency <br /> -The cast side is fenced. -A second site,located at 8590 S Newcastle <br /> The south fork of Little John Creek runs along Road,Stockton,will be used as an alternate <br /> the south side. disposal site,as necessary. <br /> The west and north sides are agricultural land. -This site has a Cannery Waste Disposal Site <br /> Permit and was used in the previous several <br /> years. <br />