Laserfiche WebLink
Part 3. FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> Fi1.DESIGN(describe): <br /> ®2.OPERATION(describe): <br /> ❑3. OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe). <br /> ®4.OTHER(describe): <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS <br /> 1) DISPOSAL/TRANSER(unit) <br /> 2) OTHER(unit) <br /> b. DAILY DESIGN TONNAGE(TPD) (1 <br /> c. FACILITY SIZE(acres) <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd) 1 <br /> e. DAYS AND HOURS OF OPERATION <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY: <br /> .� <br /> a. SITE STORAGE CAPACITY(cu yds) X'Plo 'R.e <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY <br /> a. <br /> a. AVERAGE DAILY TONNAGE(TPD) \ <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds) OJA <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds) N <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds) <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds) pA � <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions): `V <br /> g. LAST PHYSICAL SITE SURVEY(Date) - <br /> h. ESTIMATED CLOSURE DATE(month and year) <br /> i. DISPOSAL FOOTPRINT(acres) <br /> j. SITE CAPACITY PLANNED(cu yds) <br /> k. 1. (i) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste) 9/A <br /> AND ' <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v) <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace) <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> QA. MUNICIPAL OR UTILITY SERVICE: <br /> ®B.INDIVIDUAL(wells): <br /> rSURFACESUPPLY: <br /> 1.NAME OF STREAM,LAKE,ETC.: <br /> 2.TYPE OF WATER RIGHTS: <br /> RIPARIAN APPROPRIATION <br /> 3. STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE: <br /> Page 2 <br />