Laserfiche WebLink
Monitoring Well Installatio ork Plans July 2015 <br /> Monitoring Well Installation Report <br /> and that, based on my inquiry of those individuals immediately responsible for <br /> obtaining the information, I believe that the information is true, accurate, and <br /> complete. I am aware that there are significant penalties for submitting false <br /> information, including the possibility of fine and imprisonment." <br /> 3. Resolution No. 92-49, Section II, A, 8. states: The Regional Water Board shall: <br /> Require the discharger to provide documentation that plans and reports are <br /> prepared by professionals qualified to prepare such reports, and that each <br /> component of investigative and cleanup and abatement actions is conducted <br /> under the direction of appropriately qualified professionals. A statement of <br /> qualifications of the responsible lead professionals shall be included in all plans <br /> and reports submitted by the discharger. <br />