My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PR0440063_1990-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VIA NICOLO
>
17950
>
4400 - Solid Waste Program
>
PR0440063
>
COMPLIANCE INFO_PR0440063_1990-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 3:46:00 PM
Creation date
7/3/2020 11:20:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PR0440063_1990-2019
RECORD_ID
PR0440063
PE
4467
FACILITY_ID
FA0002971
FACILITY_NAME
MUSCO FAMILY OLIVE CO
STREET_NUMBER
17950
Direction
W
STREET_NAME
VIA NICOLO
City
TRACY
Zip
95377
APN
20911032
CURRENT_STATUS
02
SITE_LOCATION
17950 W VIA NICOLO
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sfrench
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4467_PR0440063_17950 W VIA NICOLO_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Musco Family Olive Com y - 2 - 25 June 2015 <br /> Pond A Clean Closure Work Plan <br /> contaminated materials, the discharger demonstrates that removal of all remaining <br /> contamination is infeasible, the surface impoundment shall be closed as a landfill or land <br /> treatment unit, as appropriate, pursuant to ¶(b)(2). <br /> According to this plan, Musco is proposing to conduct the following in support of clean closure: <br /> • Evaporate liquids until September 2016, <br /> • Remove sludge, precipitates, settled solids, <br /> • Remove primary synthetic liner, <br /> • Inspect drainage layer and secondary clay liner for staining, discoloration, and <br /> precipitation of pond solids, <br /> • Wash primary synthetic liner and LDS piping (drainage layer) and recycle offsite <br /> • Wash and remove LDS sand (drainage layer), <br /> • Collect soil samples from secondary clay liner in accordance with proposed sampling <br /> plan section 4.0 of closure plan, <br /> • Excavation of a few inches of clay liner along the discharge laterals. <br /> Based on staff's review, this plan does not propose to remove all the components of the Pond A <br /> liner system. The plan also does not propose to conduct soil sampling of the underlying native <br /> material and it does not discuss what procedures will be performed to support clean closure if <br /> the clay liner is found to be in a degraded condition. <br /> Therefore, by 28 July 2015, the Final Closure Plan must be revised to incorporate the concerns <br /> discussed above. Furthermore, Musco shall also describe in the revised plan how they propose <br /> to perform the washing of the primary liner, and LDS sand, and collect the wash water. Since <br /> additional evaluation is required to expand the plan, staff suggests that Musco contact staff to <br /> arrange a meeting for the discussion regarding clean closure of Pond A. <br /> Please call me directly at 916-464-4737 or email me at tdelfrate waterboards.ca.gov to set up <br /> the meeting or if you have questions. <br /> TODD A. DEL FRATE, P.G. 7394 <br /> Engineering Geologist <br /> WDRs Compliance and Enforcement <br /> cc: Robert McClellum, San Joaquin County Environmental Health Department, Stockton <br /> Andrew Romolo, Terraphase, Oakland, CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.