Laserfiche WebLink
Musco Family Olive Compano • 29 July 2014 <br /> Site Inspection Report Photo Log <br /> k.; <br /> �w <br /> Photo 1: Effluent pipe discharging from factory to Photo 2: Looking southeast across Pond A. Note <br /> Pond A. Pond A LCRS is non-functional yet, Pond A is full. Processing season starts in <br /> discharge of designated waste continues. Note September. <br /> freeboard is near two foot maximum. <br /> f <br /> Z. <br /> n <br /> �x a <br /> Photo 3: Lysimeter 18 inspected. Lysimeter 18 is Photo 4: Staff gauge of Pond A. <br /> part of the unsaturated zone monitoring system <br /> that has recorded elevated EC readings from water <br /> collected during monitoring events. <br />