Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 5 of 6) <br /> XVII. FILL RISER SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Unknown Fiberglass A x❑ I B ❑x 1 C ❑X D ❑x <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines(Specify): <br /> ❑ Industry Code or Engineering Standard(Specify): <br /> Z Engineered Method(Specify): Caldwell Systems/Hydrostatic 30 Minutes <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages2 <br /> Fill Riser Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 6/10/2023 <br /> ICC UST Service Technician #5246802-UT 3/21/2021 <br /> Underground Storage Tank Tester License #90-1120 12/31/2022 <br /> XVIII. COMMENTS <br /> Provide any additional comments here. <br /> XIX. VENT/TRANSITION SUMP TESTING INFORMATION <br /> Manufacturer Identify Vent/Transition Sump ID from Section III for each Manufacturer <br /> Bravo S stems/Fi berg lass a 0 I b ❑ c ❑ 7 d <br /> a ❑ I b ❑ c ❑ I d <br /> Test Method Used: ❑ Manufacturer Guidelines(Specify): <br /> ❑Industry Code or Engineering Standard (Specify): <br /> 0 Engineered Method(Specify): Caldwell Systems/Hydrostatic 30 Minutes <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Vent/Transition Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 6/10/2023 <br /> ICC Service Technician #5246802-UT 3/21/2021 <br /> Underground Storage Tank Tester License #90-1120 12/31/2022 <br /> XX. COMMENTS <br /> Provide any additional comments here. <br /> NA-Section III-No Vent/Transition Sump-B, C & D. All Tanks Vent Piping and Vent Piping Containment terminate at Vent <br /> Sump A. <br /> ID=Identification <br />