Laserfiche WebLink
RECEIVED <br />UNDERGROUND STORAGE TANK AUG 0 6 2020 <br />MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br />XVI. MONITORING SITE PLAN r -KR t- . . -_ <br />Date site map was prepared: <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with yc n m <br />Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) in -tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps, 9) devices monitoring under -dispenser containment; 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas. <br />Site Address: kIETTLEILI-\ CBEVROV 601 kTTTLE__NL%_N LANE LODI CA 95_40 <br />.. ..... .1. 7 <br />. . . . . . . . . .P!:I- <br />. . _ . . . . . . . <br />91 <br />© xO _ . . . <br />3.0 . . . . . " . <br />O O . . . . . . . . <br />IJ x <br />E <br />x <br />x <br />DIE <br />IE9 <br />A= xrrt.-car. Sensor <br />F= FILLS <br />C=�: POR <br />P =PROBE <br />L =Turbine • Leak Detector <br />... . . . . <br />x0 <br />O <br />x=SLNIPSENSOR <br />B = Brine Sensor <br />O <br />O x <br />S = Smart Sensor <br />C = Floats \ Chains <br />OO <br />E=ESrop <br />*PIPLNG = OVERFILL uaata._ <br />(ARROWS) C -STORE <br />Drslin= of piping <br />exit of sump and <br />UDC's. \o <br />underwound <br />drattitL is <br />accurate, t,,e <br />oannotspeculate .knp items underground that are not visible to the certifi-ing technician are a <br />blueprints. professional opinion only and are soleh. for information at purposes" Drawing not to <br />scale. <br />Date map was drawn: 7121/201 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it. rather than this page, with your Monitoring System Certfication. On your she plan. <br />shoti the general layout of tanks and piping. Clearly identify locations of the following equipment, if Installed: monitoring system ccntrcI panels; sensors monharrng tank <br />annular spaces, sumps. dispenser pans. spill containers. or other secomdary containment areas: mechanical or electronic line leak deterors; and in -tank liquid level <br />probes (if used for leak detection). In the space proviied, note the date this Site Plan was prepared. <br />rH <br />