Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared.- <br /> If <br /> repared:If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following <br /> equipment, if installed: 1) monitoring system control panels;2)in-tank liquid level probes(if used for leak detection);3) devices <br /> monitoring tank annular spaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent <br /> piping; 7)devices monitoring vapor recovery piping;8)devices monitoring vent/transition sumps;9)devices monitoring under-dispenser <br /> containment; 10 line leak detectors;and 11 devices monitoring any other secondary containm <br /> JUL 2 2 x020 <br /> ENVIRONMENTAL HEALTH <br /> ;DEPARTMENT <br /> VV.Yosemite <br /> L4 L2 <br /> STAGE I OPW <br /> DT HAVE FLAPPERS SYSTEM <br /> V V <br /> VfR ISD ON SITE <br /> .•C6 P <br /> d <br /> LU � <br /> B <br /> VE <br /> NEED LIFT FOR C VR 7-Eleven #17647 <br /> VENTS m 9048 W. Yosemite <br /> Lks Manteca, CA <br />