My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 6:35:43 PM
Creation date
7/6/2020 1:03:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> 71 SO-TOOLCT PROCEDURE BELOW, <br /> FOR 71 SO-TOOL, SEE PAGE 8 71 SO-TOOLCT <br /> T i <br /> FOR 71 SO-TOOLC, SEE PAGE 9 I <br /> s <br /> O <br /> STEP 9C: INSERT 71 SO-TOOLCT OVER INLET TUBE <br /> To install the 71 SO-TOOLCT (sold separately) over the <br /> inlet tube, first loosen the thumb screws, so the tool can <br /> pass freely over the inlet tube flange . Align the slot on <br /> the tool with the key on the inlet tube and insert the <br /> tool down . See Figure 9C . Tip to stop dimension must <br /> be 1 -3/16" to 1 -1 /4" <br /> Loosen Figure 11 C <br /> thumb Hand tighten STEP 12C: DRILL HOLES <br /> screws <br /> Tool Slot thumb screws With the inlet tube and 71 SO-TOOLCT in place, carefully <br /> drill a 3/16" diameter hole in the upper tube using the <br /> o © p o hole in the 71 SO-TOOLCT as a guide. The drill stop is <br /> d r positioned so it will bottom out against the tool after <br /> the bit has drilled through the upper drop tube. If the <br /> stop is positioned wrong either no hole will be drilled, <br /> 1C or a through hole could potentially be drilled through <br /> the inlet tube . If no hole is drilled return to step 11 C <br /> ,1 and check the stop dimension . If a hole is drilled <br /> / ( through the inlet tube or into the screw hole the assem- <br /> bly is not salvageable. Drill (2) more holes in the two <br /> Inlet remaining guide holes . <br /> Tube <br /> Key o <br /> o 0 <br /> I �� <br /> Figure 9C Figure 10C <br /> f <br /> STEP 10C : TIGHTEN THE 71 SO-TOOLCT <br /> Ensure that the tool seats flat against the top of the inlet <br /> tube. To prevent vertical movement of the tool during Drill through uppertube only <br /> drilling, hand tighten the thumb screws against the up- <br /> per drop tube. See Figure 10C. <br /> STEP 11 Co PREPARE DRILL AND BIT <br /> Confirm that the stop on the 3/16" drill bit supplied Figure 12C <br /> with the 71 SO-TOOLCT is in the correct position before <br /> drilling . The stop is factory installed at a distance be- <br /> tween 1 -3 /16" to 1 - 1 /4" from the tip with the 71 SO- <br /> i TOOLCT. If the stop is not at the correct position it must <br /> be fixed before drilling . <br /> CAUTION : If the drill stop is not in the proper loca- <br /> TT <br /> tion failure of a pressure decay leak test may results <br /> i <br /> i <br /> 10 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.