My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 6:35:43 PM
Creation date
7/6/2020 1:03:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j <br /> STEP 25 : INSTALL WARNING PLATE <br /> Bend the three warning plate ears down then slide the <br /> tie wrap over the warning plate ears and position warn - <br /> ing plate against riser pipe approximately 1 " below the <br /> adaptor. Tighten the tie wrap securely. The valve is <br /> now fully installed and in operating position . <br /> 0 <br /> NOTE : the warning plate includes important warn- <br /> ings, operating parameters, and listing information 0 <br /> and must be installed . A <br /> vbRr i�i5't <br /> RI <br /> dw AIJ010 <br /> ,rt <br /> ao6 p*' <br /> s <br /> ° Manufacturer: "OPW" <br /> I <br /> Model: "7150-4" <br /> (4" represents size) <br /> Manufacture Date, <br /> "MFG MMYY" <br /> MM= Month YY= Year <br /> Warning <br /> %ate <br /> Figure 26 - Product Identification <br /> Figure 25 <br /> STEP 26 : VALVE REMOVAL <br /> The valve can be removed for tank leak testing, inspec- <br /> tion, etc ., by removing the Rotatable Product Adaptor, <br /> the 4" nipple, and the Jack Screw Kit. Reinstall per the <br /> above instructions . <br /> For testable models only: It is not necessary to re - <br /> move the valve to check poppet movement / function . <br /> See Page 17 for full testing details . <br /> STEP 27 : ELECTRONIC LIQUID LEVEL MONITORING <br /> If an electronic level monitor is installed, it must be cali- <br /> brated to match the top of the 71 SO valve body, which <br /> must correlate with 95 % of the actual tank capacity . <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.