My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2020 6:35:43 PM
Creation date
7/6/2020 1:03:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C ( continued ) <br /> 71 SO Overfill Valve in Tank Complete Shut Off Level Worksheet <br /> Important : This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions . All length measurements are in inches . Please contact the Authority Having Jurisdic- <br /> tion ( AHJ ) and review local, state, and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region, as well as take into account other considerations such as extreme tank tilt . <br /> Take the following measurements with the valve in - <br /> stalled in the tank: [ <br /> Distance from the 71 SO inlet tube flange to the cast ---- "- --- - <br /> lug in the 71 SO body ( see figures ) , upper tube length . <br /> Note : the Upper Tube Length must be at least 16" to in - <br /> clude the protective bend in the tube . <br /> ( D ) _ <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube, valve length . <br /> (W ) _ (D) <br /> ( U ) = Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note : If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 & 61TP models add 0 .6") (Tbottom <br /> ( B ) = <br /> From the tank calibration chart provided by tank manu - <br /> facturer find the dipstick number (Y) which corresponds <br /> to the 100% volume. <br /> ( B) <br /> (Y) = To Tank <br /> 1 . To determine complete shut-off percentage: <br /> Tank <br /> Subtract upper tube length (D) from distance to tank ( U) Valve Chart <br /> bottom ( B ) Length, 100% <br /> (X) = ( B ) - ( D ) + 1 . 5 = top of Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100% volume (Y) tank <br /> capacity. <br /> (X) tank capacity in gallons = <br /> (Y) tank capacity in gallons = <br /> Complete SO% = (X) capacity / (Y) capacity x100 = <br /> Note: The overfill valve must be installed per AM re- <br /> quirements and all applicable local, state, and national <br /> codes . If the overfill valve is set above the allowable <br /> shut-off percentage the overfill valve must be removed <br /> and replaced . <br /> Note : This Appendix only applies to valves installed per Appendix C . See Appendix B for the standard valve <br /> installation tank shut off level worksheet . <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.