Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Date site map was prepared: <br /> If you already have a site plan that shows all required information,you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels, 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,4)devices monitoring product piping, 5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps;9) devices monitoring under-dispenser containment 10) <br /> line leak detectors,and 11)devices monitoring any other secondary containment areas. <br /> SMAddress Wine Country 76 1111 East Kettleman Lane Lodi,CA 95240 <br /> *PIPING- CAP,WASH <br /> (ARROWS) <br /> Dramin.=of pipuL <br /> exit of sump and <br /> LMC's.'`:o <br /> underaround <br /> anums-L accurate. <br /> \b2 Cannot <br /> speculate blue <br /> prints. <br /> V� <br /> STORE <br /> . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . <br /> r . . . . . . - . <br /> 87 . . <br /> . . . . . . . <br /> KEY <br /> =!ivtiCL_kK Sensor <br /> -- - - - <br /> F=FILLS <br /> v t V=VAPOR <br /> . . . . . . . . . . . . . . P=PROBE <br /> r <br /> os�. r - _ L=Turbine-Leak Derector <br /> . <br /> a S=Sn IP SENSOR <br /> t . . B=Brine Sensor <br /> _ . . . . . S=Smart Sensm- <br /> C=Floats&Chain; <br /> . . . . . . . . . . . . . E=E Stop <br /> Kp <br /> ,_qt9M@p Lane <br /> _ltttiretta rttair�marl rhrc are rrar li-r61s to rJrz cerri{.ing rcr lsritim;tta•a <br /> pq/arsrwnloprrarnrort{:arrla-ecdeh•fw-irlforneui�rnJprnFxxe- L'b-rnrirr� <br /> nor to sale <br /> Date map was craam: 70 ?;20 <br /> Instructions <br /> If you already have a diagram that shows ai required information.you may include it rather than this page,with your Morkoting System Certification. On your site plan, <br /> show the general layout of tanks and piping. Ctearly xientAy locations of the following equipment.if installed monitoring system control panels;sensors monitoring;tank <br /> annuls spaces,sumps.dim penser pans,spill containers,or other secondary containment areas mechanical or elexronic line leak detevors;and in-tank liquid level <br /> probes(if used for beak deiect�on). In the space p�owded,note the cate this Site Rar was prepared. <br /> LEGEND <br />