Laserfiche WebLink
Page 2 of 3 <br /> 2. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment lased: I" Oil filled Gauge Equipment Resolution: 0 <br /> 87 Product 91 Product Diesel Product Vapor <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 2"/3" 2"/3" 219/3" 2"/3" <br /> Length of Piping Run: Apron 150' Apron 150' Apron 150' Apron 150' <br /> Product Stored: 87 Gas 91 Gas Diesel Vapor <br /> Method and location of Boots Boots Boots Boots <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 10:05am 10:05am 10:05am 10:05am <br /> Initial Reading(RI): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time. 11:05am 11:05am 11:05am 11:05am <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: 1 ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> d' <br /> L J1 <br /> y �V�e.1^ 6.. / <br /> Ij V!-7 <br />