My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2022 1:20:33 PM
Creation date
7/6/2020 1:23:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
CHEVRON STATION #212470/2222*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RPI 200-12 <br /> there are items that must be repaired or replaced 6.5.6 Test Procedure. <br /> (e.g., deteriorated penetration fitting boots), 1.Begin the test by adding water to the sump to a <br /> notify the owner/operator and obtain approval minimum of 4 inches above the highest sump <br /> prior to proceeding with repairs. penetration or sump sidewall seam,whichever is <br /> 4.Test boots or secondary containment termina- higher. To compensate for sump deflection, the <br /> tion fittings must be present on the piping pen- water must be allowed to settle a minimum of <br /> etrating the sump. During testing, these fittings 15 minutes before taking the initial test measure- <br /> prevent water from entering the interstitial space ment. If the highest sump penetration or sump <br /> of double-walled piping. Without these fittings, sidewall seam is less than 4 inches from the top <br /> the integrity of the sump cannot be tested using of the sump, add water to within 1 inch of the <br /> this method. top of the sump. <br /> 5.If interstitial monitoring sensors are present 2.Place the measuring stick vertically at the lowest <br /> within the containment sumps, temporarily point in the sump and extending above the water <br /> remove them before conducting the test. If the level in the sump to allow for an accurate mea- <br /> sensor is removed, reposition after testing to surement to be taken. The location of the mea- <br /> appropriate position according to the manufac- suring stick must remain the same for each water <br /> turer's instructions. level measurement. Document the initial water <br /> 6.If the containment sump is found to have cracks, level measurement as measured from the bottom <br /> of the sump. Alternative measurement methods <br /> loose parts or separation of any joints or penetra- <br /> tion fittings, it is not considered to be liquid- may be used provided that the measurement to <br /> tight.This visually indicates a test failure. 1/16 (0.063)inch can be made. <br /> 3.Take all precautions to prevent the water level <br /> CAUTION: Water can damage electrical from being disturbed during the duration of the <br /> connections. Ensure that there are no test. <br /> components that can be damaged by the 4.After 1 hour, document the ending water level <br /> addition of water to the sump. If such measurement. <br /> components are present,take appropriate <br /> precautions when performing the test or 5.Upon completion of the test: <br /> use an alternative test method. • remove all water and properly dispose of it <br /> according to Section 6.7; <br /> • reinstall any interstitial monitoring sensors in <br /> their proper positions; <br /> ra <br /> • return the test boots or secondary contain- <br /> Ment fittings to their pre-test operating con- <br /> figurations; <br /> er Electrical <br /> Wat <br /> Level Jurxiion <br /> Box <br /> Electrical <br /> Conduit — <br /> Water <br /> Product Level <br /> Piping <br /> Electrical <br /> Conduit <br /> 1 <br /> 1-7-1 <br /> FIGURE 6-5. The test fluid level in the UDC must be at Product <br /> -= Piping <br /> least 4 inches above the highest sump penetration or <br /> sidewall seam. -- -- <br /> - --- FIGURE 6-6. To prevent leakage, check all penetration <br /> fittings before adding water to ensure they make a tight <br /> seat. <br /> 0 pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.