Laserfiche WebLink
GEra <br /> GENESIS ENGINEERING 8 REDEVELOPMENT <br /> • Field measurements <br /> • References to all pertinent data collection forms <br /> If the field data is recorded on an appropriate data collection form,then all the data need not <br /> be recorded in the logbook. A brief description of the sampling data along with the reference <br /> to the data forms used will be recorded to ensure that the field data forms can be referenced <br /> to the specific logbook entry. <br /> In addition to field logbooks, field personnel will complete other records of field activities, as <br /> appropriate. A list of the appropriate forms, as well as a brief summary of information to be <br /> recorded follows: <br /> • Boring Log Form—description of subsurface conditions at boring locations <br /> • Chain-of-Custody Record—instructions to the laboratory as to the appropriate <br /> analytical method(s) for each sample <br /> Recorded information shall summarize, organize, and/or clarify data. If corrections are <br /> necessary, these shall be made by drawing a single line through the original entry (in such a <br /> manner that the original entry can still be read). The corrected entry shall be written <br /> alongside the corrections and shall be initialed and dated. Completed forms will be provided <br /> in the draft and final Site Investigation reports. <br /> 6.0 SITE CHARACTERIZATION REPORT <br /> A Site Investigation Report will be prepared following data analysis. The report will include <br /> a description of drilling and sampling procedures, appropriate descriptive tables, maps, and <br /> figures; and supplemental information as appropriate. The report will include <br /> recommendations for further site characterization activities should they be warranted. <br /> 7.0 SCHEDULE <br /> Fieldwork would be initiated within upon completion the required permits and receipt of <br /> authorization to proceed. The fieldwork schedule will depend on the drilling subcontractor's <br /> schedule and site access agreements. Assuming a 14-day tum-around for receiving the <br /> analytical results,the Site Investigation Report is scheduled to be completed within 5-6 <br /> weeks of receiving Work Plan approval. <br /> 2303 West Lane I I of 11 <br /> Site Investigation Work Plan <br /> May 2009 <br />