Laserfiche WebLink
L.�clayt°ri <br /> Ms. Margaret Lagorio Page 2:E <br /> San Joaquin County EHD Clayton Project No. 70-05669.00 <br /> April 27, 2005 <br /> subject parcel is located west of West Lane and north of Klinger Road in Stockton, <br /> California. Construction activity is scheduled for the northern portion of the subject <br /> parcel, and the planned investigation is designed to evaluate whether the subsurface has <br /> been impacted. <br /> SCOPE OF WORK <br /> Clayton has developed an approach to perform subsurface investigative activities to <br /> evaluate potential impacts to the subsurface. The approach is detailed in the following <br /> sections. <br /> PRE-FIELD ACTIVITIES <br /> The purpose of the pre-field activities is to appropriately plan the work and to ensure that <br /> onsite personnel are prepared for potential safety hazards at the property. The pre-field <br /> activities will include the following: <br /> • Preparing a Site Health and Safety Plan (HASP)to reflect the work proposed at the <br /> subject property. The HASP will describe the work to be performed, safety <br /> precautions, emergency response procedures,nearest hospital information, and onsite <br /> personnel responsible for managing emergency situations. A copy of the HASP is <br /> provided as Attachment A. <br /> • Marking the site boundaries and proposed investigation areas with white paint and <br /> notifying Underground Service Alert(USA) at least 48 hours prior to performing <br /> field activities. <br /> • Utilizing a private utility locating service prior to conducting the field activities for <br /> clearing proposed investigation locations relative to the presence of subsurface <br /> utilities. <br /> • Obtaining drilling permits from San Joaquin County. <br /> FIELD ACTIVITIES <br /> Field activities for this project will consist of drilling eight exploratory soil borings to <br /> investigate subsurface conditions. One soil boring will extend to a maximum of 30 feet, <br /> and the remaining borings will extend to maximum of five feet. The soil borings will be <br /> spatially positioned to assess the areas of proposed construction, as outlined below: <br /> S'.\ES\PRWECTS\Verim Wirelco@005\05669 Asilc Phue II\workplan.doc <br />