My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012649
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0524706
>
ARCHIVED REPORTS_XR0012649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:16:03 AM
Creation date
7/7/2020 9:02:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012649
RECORD_ID
PR0524706
PE
2960
FACILITY_ID
FA0016587
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
01
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If necessary, upon exit from etre work site, loose debris will be r•t:ruoved <br /> frau l;roLective clothing by Imushiril; or rinsing; Gloves and boots will he <br /> decontarninaLed in a 5% soltrticxr of trisallum phosp}rale and r'in,ed with water <br /> which will be disposeri of on-siLe. Respirator cartridges, per-filters, <br /> inner gloves and coveralls will be placed in a drum cxr--site Cor disposal. <br /> do one will exit the site with contaminated clothing Or equilrsne..nt. <br /> EME'RGEtcY RESPONSE <br /> jr the potential exists fur fire, explosion or toxic material release during <br /> on-site activities. Prior to cUlgliencelnent of any activities, pevsorrrlel will <br /> have available telephone nurnburs and contacts for eriiergency response assisLance <br /> including: <br /> p Ambulance <br /> o Fire Department <br /> p Hospital <br /> o Poison Control Center <br /> O Conrnunzty Evacuation Contact <br /> Emergency equilxnent on-siLe will include: <br /> o Portable eyewash bottles <br /> o lndusLr•ial first aid kit <br /> SITE SECURITY <br /> Access during all oil-site activities will be restricted to authorized personnel. <br /> All personnel and authorized visitors must contact the Safety Coordinator/ <br /> Project Manager prior to entering and exiting site. <br /> RECORD KEEPING <br /> All site safety records pertaining to the site characLerization study will he <br /> maintained by the Safety Coordinator/Project Manager throughout the project. <br /> AIR mollITORING <br /> 'fire Safety Coordinator/Project Manager will conduct periodic air monitoring <br /> using direct reading sampling equipment as required. At a minimum the <br /> following monitoring will be performed. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.