My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
3750
>
2900 - Site Mitigation Program
>
PR0526222
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:10:55 AM
Creation date
7/7/2020 9:06:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526222
PE
2965
FACILITY_ID
FA0017743
FACILITY_NAME
LODI VINTNERS INC
STREET_NUMBER
3750
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01322007
CURRENT_STATUS
01
SITE_LOCATION
3750 E WOODBRIDGE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kTj K L 1, 1 �F E 1, 1)E R <br /> The water level measurements are converted to elevations using the surveyed casing <br /> elevations. <br /> A-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site- The sampling <br /> protocol for each well is as follows: <br /> 1. Down-well equipment (pumps, bailers, etc.) is decontaminated by steam <br /> cleaning, or by scrubbing in a trisodium-phosphate or non-phosphate detergent <br /> wash followed by a distilled water rinse, prior to use in each well. Bailer cord is <br /> replaced prior to use in each well. <br /> 2. The depth to groundwater is measured using a conductivity-based water-level <br /> meter. <br /> I The volume of water in gallons standing in the well is calculated by subtracting <br /> the depth to groundwater measurement from the depth of the well and <br /> multiplying by the appropriate conversion factor (0.16 for 2-inch wells, and 0.65 <br /> for 4-Inch wells). <br /> 4. Three to five well volumes of water are purged from each well using a <br /> submersible pump, bladder pump, or Teflon bailer. <br /> 5. Physical parameters (pH, electrical conductivity, and temperature) are monitored <br /> for stability while purging. The physical parameter measurements are recorded <br /> on purge-and-sample logs, along with the time and volume of water purged at <br /> each measurement. <br /> 6. Samples are collected with a disposable bailer or bladder pump into <br /> appropriately prepared bottles provided by the analytical laboratory. <br /> 7. Samples for metals analysis are usually filtered in the field at the time of <br /> collection. <br /> ,S. Samples are immediately labeled and placed in an iced sample container. At the <br /> end of the day, the samples are delivered to the analytical laboratory under <br /> chain-of-custody control. <br /> A-5 VADOSE ZONE MONITORING <br /> 1. Prior to conducting lysimeter sampling, the pressure-vacuum equipment is <br /> checked and cleaned. A Soil-Moisture hand pump with a pressure-vacuum gage <br /> is used to measure residual and implied pressure-vacuum. Nitrogen gas is used <br /> to purge the lysimeter system for sampling. An air pump is available as a back <br /> up, <br /> 67451A F"I 1ST06R295/FB Av Page A-6 <br /> 2006 Klein elder, Inc. March 31,2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.