My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
3750
>
2900 - Site Mitigation Program
>
PR0526222
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:10:55 AM
Creation date
7/7/2020 9:06:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526222
PE
2965
FACILITY_ID
FA0017743
FACILITY_NAME
LODI VINTNERS INC
STREET_NUMBER
3750
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01322007
CURRENT_STATUS
01
SITE_LOCATION
3750 E WOODBRIDGE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kn KL1-', 1 \FELDER <br /> APPENDIX B <br /> HEALTH AND SAFETY PLAN <br /> ........................................-................ <br /> .......... <br /> .................-........................ .......... <br /> Project No: 67451_WP Date: 3/31/06 <br /> Client: Lodi Vintners, Inc ...... Address: P.O. Box 549, .Woodbridge, CA <br /> Site Contact: Tyson, Rippey Site Phone No. 209-368-5338 <br /> Job Location: Lodi Vintners Winery, 3750 E Woodbridge Rd, Acampo, CA 95627 <br /> Work Objectives: Drill three borings,.instail three monitoring wells. <br /> Key Individuals: Joe Zilles, PG Project Manager: Fran Bean <br /> Site Health and Safety: Fran Bean, Cell Phone 209-993-7657 <br /> Prepared by: Fran Bean — Reviewer/Approver: Joe Zilles <br /> Hospital/Clinic: Lodi Memorial Hospital <br /> Phone No.—(209) 339-7600 <br /> Address: 1235 W Vine St, Lodi <br /> REFER TO PLATE H1 FOR HOSPITAL LOCATION AND ROUTE TO HOSPITAL <br /> Paramedic 911 Fire Dept. 911 Police Dept. 911 <br /> Emergency/Contingency Plans: Stop work and evaluate situation. Shut down heavy <br /> equipment and stabilize victim(s). Notify health and safety officer or site project <br /> manager. Apply first aid and/or seek medical aid as necessary. Move injured <br /> personnel only if injuries permit. Cali Ambulance and/or Medical Personnel to transport <br /> injured to hospital. Refer to Plate 1 for location of nearest emergency medical facility <br /> site. Health and safety officer to notify Client and appropriate personnel of situation. <br /> 15 Minute Eyewash: Required Fire Extinguisher: Required <br /> First Aid Kit: Required <br /> Site Control Measures: Control access to drilling area by blocking site traffic in and <br /> around drilling locations with support vehicles. <br /> Personal Decontamination Procedures: Skin that comes in contact with chemicals or <br /> soil/water with suspected contaminants shall be washed immediately with soap and <br /> water. Hands and face shall be thoroughly washed prior to eating, drinking, smoking, or <br /> other hand to mouth contact. <br /> 67451.WPi IST06R2951FBAv Page B-1 <br /> March 31,2006 <br /> 2045 Kleinfekder,hn, <br />
The URL can be used to link to this page
Your browser does not support the video tag.