Laserfiche WebLink
Page 1 of 1 <br /> Lori Duncan [EH] <br /> From: Art Deicke[adeicke@advgeoenv.com] <br /> Sent: Friday, April 16, 2010 3:17 PM <br /> To: Lori Duncan [EH] <br /> Cc: rmarty@advgeoenv.com <br /> Subject: Ernie's GS Interim Remediation System Installation Status Update#5 <br /> Lori, <br /> Last week, we reported that PG&E made a site visit to determine the actual build-out of the electrical <br /> lines servicing Emie's General Store. We also discussed several contingencies for providing power. <br /> At this time, there is nothing significant to report. I talked with Carr Electric this morning and they have <br /> almost completed the cost proposals for the two options that we are considering. Carr was waiting on <br /> two subcontractor proposals for either horizontal drilling or trenching from the surface, but had all other <br /> data required to prepare their proposals. We should have the proposals next week and will then submit <br /> a cost pre-approval request to the USTCF. <br /> Best regards, <br /> Art <br /> Arthur Deicke <br /> Advanced GeoEnvironmental, Inc. <br /> Stockton • Santa Rosa • Monterey • Brea • Spokane <br /> 1-800-511-9300 <br /> adeicke@eadvgeoenv.com <br /> www.advgeoenv.com <br /> This email message is for the sole use of the intended recipient(s)and may contain confidential and privileged information. <br /> Any unauthorized review,use, disclosure or distribution of this email/Pax is prohibited. If you are not the intended recipient, <br /> please contact the sender by email/fax and destroy all paper and electronic copies of the original message. <br /> 4/16/2010 <br />