My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:19 AM
Creation date
7/7/2020 9:11:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 14 April 2008 <br /> AGE-NC Project No. 01-0839 <br /> Page 2 of 2 <br /> In addition,AGE proposes in the near future to utilize granulated activated carbon(GAC) vessels <br /> to remediate the hydrocarbon-impacted soil vapor once concentrations decline to 200 parts per <br /> million volume (ppmv). AGE anticipates that concentrations will reach this threshold(200 ppmv) <br /> within 6 to 12 months of continuous operation of the catalytic oxidizer SVE system.The use of GAC <br /> vessels would off-set the costs of propane fuel necessary for the operation of the TCAT 250. <br /> AGE will modify the existing San Joaquin Valley Air Pollution Control District (SJVAPCD) <br /> "Authority to Construct"permit(No.N-7738-1-0)to reflect the purposed SVE model modifications, <br /> as well as,the transition to GAC vessels following the decline in concentrations to 200 ppmv;a copy <br /> of the new SJVAPCD permit packet is included in Appendix B. Once approved by the EHD,AGE <br /> anticipates the installation of the TCAT 250 in the end of May 2008. <br /> Please contact our office at(209) 467-1006 if you have any questions or comments. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> r* Not <br /> RC�7473 ,k <br /> Ally L. C vita William R. Little <br /> Staff Scientist Senior Project Geologist sf aP <br /> California Professional Geolo °F wP 473 <br /> cc: Mr. Ernest P. Giannecchini <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.