My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2900 - Site Mitigation Program
>
PR0535375
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 9:15:19 AM
Creation date
7/7/2020 9:11:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535375
PE
2960
FACILITY_ID
FA0020405
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 June 2006 <br /> AGE-NC Project No. 01-0839 <br /> ' Page 8 of 8 <br /> ' to a DHS-certified analytical laboratory for analysis.Each sample will be analyzed within 72 hours <br /> for the constituents listed in Section 2.2.. <br /> ' 3.6. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> All sampling tools used for sample collection will be thoroughly rinsed with clean water after being <br /> washed with a solution of Alconox. All probing rods will be cleaned prior to advancement at each <br /> probe boring location, and all down-hole and drilling equipment will be pressure washed prior to <br /> 1 starting each boring.Cuttings and rinseate generated during drilling will be containerized in properly <br /> labeled,Department of Transportation(DOT)-approved 55-gallon drums and stored on-site.Disposal <br /> alternatives will be evaluated based on the results of soil and ground water analysis. <br /> 3.7. BORING ABANDONMENT <br /> ' The proposed probe boring will be permanently sealed to prevent vertical migration of potential <br /> contaminants.The borings shall be abandoned by backfilling with portland cement utilizing a tremie <br /> pipe from total depth to surface grade. <br /> 1 <br /> 1 <br /> 1 <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.