Laserfiche WebLink
AEI Project No. 305662 <br /> ' March 16, 2012 <br /> Page 5 of 5 <br /> 1 VI Estimated Schedule and Reporting <br /> Completion of this work is contingent upon approval of this work plan, receipt of approved <br /> 1 drilling permits, and pending subcontractor availability. Laboratory analytical results will be <br /> obtained within approximately one week following the sample collection. A final report will be <br /> prepared following the receipt of analytical data. <br /> 1 A final report will be prepared and submitted to the client and the SJCEHD within approximately <br /> one week following the receipt of analytical data. <br /> 1 If there are any questions regarding our investigation, please do not hesitate to contact AEI at <br /> (925) 746-6044. <br /> 1 Sincerely, <br /> AEI Consultants <br /> Bryan Campbell, PG <br /> 1 Program Manager <br /> Figures <br /> 1 Figure 1: Site Location Map <br /> Figure 2: Site Map <br /> Appendices <br /> 1 Appendix A: Health &Safety, Injury &Illness Prevention Plan <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br />