Laserfiche WebLink
[EMED Model All00 Overfill <br /> TON RETAIL Prevention Valve OPV <br /> Field Operational Test Procedure TP-A1100 <br /> For Primary Float and Flapper Valve <br /> Service Tools Reauired: <br /> • EMCO Model A0081-1101 test tool • Scribe tool <br /> Allllllm+ <br /> CAUTION: <br /> 1. Always barricade work area to keep pedestrians and vehicles from accessing the storage tank area during preventive maintenance <br /> and/or compliance testing of the phase I system. <br /> Securing the Flaooer Valve: n <br /> Ilk <br /> !! �� OCT 2 9 2018 <br /> k . <br /> ENVIRONMENTAL 'HEALTH <br /> .W^ DEPARTMENT <br /> Step 1: Remove the spill container lid. Step 2: Remove the Model At 100 OPV <br /> fill cap and adapter from the tank fill from the tank fill riser. <br /> riser. Note: only remove manhole cover <br /> and water shroud system if necessary. <br /> .r <br /> j .: <br /> fi.9 <br /> Primary <br /> Float <br /> i <br /> V ^ , <br /> I <br /> Step 3: Place the Model All 00 OPV on Figure 1: Correct position, primary float Figure 2: Improper position, primary <br /> its side with the primary float facing facing downward. float facing upward <br /> downward. Refer to Figures 1 and 2 <br /> for details. 1 <br />