My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BUCKLEY COVE
>
4950
>
2300 - Underground Storage Tank Program
>
PR0231028
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 11:04:30 AM
Creation date
7/7/2020 10:15:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231028
PE
2361
FACILITY_ID
FA0003811
FACILITY_NAME
RIVER POINT LANDING MARINA-RESORT*
STREET_NUMBER
4950
STREET_NAME
BUCKLEY COVE
STREET_TYPE
WAY
City
STOCKTON
Zip
95219
APN
11820001
CURRENT_STATUS
01
SITE_LOCATION
4950 BUCKLEY COVE WAY
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RIECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR SEP 17 2018 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> ENVIRONMENTAL <br /> 1. Site map enclosed? YES[] NO [] HEALTH nEPARTMENT <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Remove and replace diesel LD due to slow flow problems <br /> 1ZeMWe/ a -6fr�' LD ..In,s-)-C,// b11,4 1- <br /> 4. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> VMI LD2000 <br /> EH230038(revised 12-11-15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.