My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEISS
>
1512
>
2900 - Site Mitigation Program
>
PR0537963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 10:39:16 AM
Creation date
7/7/2020 10:38:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537963
PE
2950
FACILITY_ID
FA0021913
FACILITY_NAME
WRIGHT'S PETROLEUM INC
STREET_NUMBER
1512
STREET_NAME
WEISS
STREET_TYPE
WAY
City
ESCALON
Zip
95320
APN
22708001
CURRENT_STATUS
01
SITE_LOCATION
1512 WEISS WAY
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> CONTENTS PAGE <br /> 1.0 RECORDING OF FIELD DATA............................................................................................1 <br /> 2.0 SAMPLE CONTAINERS........................................................................................................1 <br /> 3.0 QUALITY CONTROL FIELD SAMPLES.............................................................................2 <br /> 4.0 SAMPLE PRESERVATION...................................................................................................2 <br /> 5.0 CHAIN OF CUSTODY PROCEDURES................................................................................2 <br /> 5.1 Sample Labels...............................................................................................................2 <br /> 5.2 Chain of Custody&Analysis Request Form...............................................................3 <br /> 5.3 Delivery of Samples to Laboratory..............................................................................3 <br /> 6.0 SAMPLING AND DRILLING EQUIPMENT DECONTAMINATION...............................3 <br /> 7.0 FIELD EQUIPMENT CALIBRATION&MAINTENANCE................................................4 <br /> 8.0 LABORATORY QA/QC PLAN..............................................................................................4 <br /> 9.0 GROUNDWATER MONITORING PROTOCOL.................................................................5 <br /> 10.0 WELL DEVELOPMENT PROTOCOL..................................................................................5 <br /> 11.0 SOIL SAMPLING PROTOCOL..............................................................................................6 <br /> 11.1 Sample Collection During Drilling..............................................................................6 <br /> 11.2 Sample Collection During Tank Removal...................................................................6 <br /> 11.3 Sampling from Soil Piles or Shallow Pits....................................................................7 <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL.......................................................................7 <br /> TABLES <br /> Table 1: Sample Containers,Holding Times&Preservation <br /> Table 2: Laboratory Test Methods -Underground Tank Sites <br />
The URL can be used to link to this page
Your browser does not support the video tag.