Laserfiche WebLink
Page 2of2 <br /> I apologize for the delay, I was expecting to send you the well permits for the drilling at U-Haul and <br /> Stockton Unified School District (SUSD) early this week -the permits were sent to Gregg Drilling last <br /> week. Gregg assures me that they immediately mailed them back to me after they signed them. <br /> They will be scanned once I receive them and submitted to you electronically. Unfortunately, I <br /> inadvertently mixed up the addresses, and the check for the well fee that was made out to San <br /> Joaquin County Health was also mailed to Gregg Drilling. I will be in the field today and tomorrow, <br /> but Dan or Ken will follow up on the well permits and overnight a second check to your office for <br /> delivery tomorrow. <br /> I have obtained an access agreement with the SUSD (included with well permits), USA has been <br /> notified, the private utility locator will mark the work areas this week, and the drillers and mobile lab <br /> are ready to start on Tuesday the 7th. I understand if the well permits cannot be approved in this <br /> short of a time span and am prepared to postpone the drilling if necessary. We will do everything <br /> we can to get them to you today. Once you receive the permits, please let me know if drilling on the <br /> 7th is still feasible. Thank you. <br /> Sincerely, <br /> Steve Woodhull <br /> Operations Manager/Project Geologist <br /> Blaes Environmental Management, Inc. <br /> Ph (602) 728-0707 <br /> Fx (602) 728-0708 <br /> Mb (602) 300-8307 <br /> 3/3/2006 <br />