Laserfiche WebLink
Emergency Shut-Off (ESO) Testing 20202384 <br /> Facility#:Arco 2093 Contractor:Gettler•Ryan Inc <br /> Address:3425 Tracy Blvd Address:6805 Sierra Ct Suite G <br /> City, State:Tracy.CA 95376 City, State:Dublin, CA 94568 <br /> Test Date:9/24/2020 Technician:Elodio Sanchez <br /> The objective of this test is to provide assurance that when the ESO switch is activated, all the fueling system circuits <br /> (turbines, and dispensers)are de-energized,and remain de-energized until they are re-set manually, <br /> SWITCH# 1 2 3 4 5 <br /> Location of ESO Building Inside <br /> (be specific) <br /> Type of Switch: Momentary Momentary <br /> Push Pull Momentary <br /> Plain light/Toggle Other <br /> Type of Turbine Control Relay System: Power Solution FE Petro IST VFC <br /> Power Integrity Custom Fab. Square D <br /> Power Solution Carolina Box Brown Box <br /> PERFORMANCE TEST <br /> Does the ESO shutdown power to the Y <br /> DISPENSERS?(YIN) Y <br /> Does the ESO shutdown power to the Y <br /> TURBINES?(Y/N) Y <br /> OVERALL RESULT(Pass or Fail) Pass Pass <br /> If the test fails and cannot be fixed while onsite, call the Help Desk&document the ticket number <br /> If the test fails,contractor MUST:place an"Out of Service"tag on the ESO(s);&notify the site manager and teach them <br /> altemative emergency shut down procedures(i-e., locate circuit panel, clearly identify turbine and dispenser breakers for shut- <br /> off in the event of an emergency) <br /> R E`% E <br /> p .m. . <br /> SEP I 12020 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />