Laserfiche WebLink
CGRS UST Spill Bucket <br /> SOLUTIONS DELIVERED Integrity Testing Form <br /> Underground Storage Tanks (UST) Program <br /> Instructions on Page 3 <br /> Purpose: This procedure is to test the leak integrity of single-and double-walled spill buckets.See reverse side for <br /> basic hydrostatic testing instructions.Consult PEI/RP1200,Section 6.2 for hydrostatic test method,Section 6.3 for <br /> single-walled vacuum test method,and Section 6.4 for double-walled vacuum test method. <br /> Testing Information <br /> 1. Tank number T1:Unleaded 87 T2 Diesel DFR <br /> 2. Product stored Gas Diesel DFR <br /> 3. Spill bucket capacity 5 Gallons 5 Gallons <br /> 4. Manufacturer OPW OPW <br /> E Single-walled E Single-walled ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled <br /> 5. Construction ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled E Double-walled ❑Double-walled <br /> N Hydrostatic ❑p Hydrostatic E Hydrostatic ❑Hydrostatic E Hydrostatic ❑Hydrostatic <br /> E Vacuum ❑Vacuum E Vacuum ❑Vacuum ❑Vacuum ❑Vacuum <br /> ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled ❑Single-walled <br /> 6. Testtype ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled ❑Double-walled <br /> E. Product ❑p Product ❑Product 0 Product ❑Product ❑Product <br /> 7. Spill bucket type ❑Vapor ❑vapor E Vapor ❑Vapor ❑Vapor ❑Vapor <br /> 8. Liquid and debris <br /> removed from spill <br /> bucket:' Yes E No 09 Yes ❑No E Yes ❑No ❑Yes E No ❑Yes ❑No E Yes E No <br /> 9. Visual inspection <br /> (No cracks,loose parts or <br /> separation of the bucket <br /> from the fill pipe.)? ©Pass ❑Fail 0 Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fall ❑Pass ❑Fail ❑Pass ❑Fall <br /> 10. Tank riser cap included in <br /> test? [5 Yes ❑No❑NA [5 Yes ❑No❑NA ❑Yes E No❑NA ❑Yes ❑No❑NA ❑Yes ❑No❑NA ❑Yes ❑No❑NA <br /> 11. Is drain valve Included In <br /> test? IN Yes ❑No❑NA I]Yes ❑No❑NA ❑Yes ❑No❑NA ❑Yes ❑No❑NA ❑Yes ❑No❑NA ❑Yes ❑No❑NA <br /> 12. Starting level 12.00" 13.50" <br /> 13. Test start time 12:00 pm 12:00 pm <br /> 14. Ending level 12.00" 13.50" <br /> 15. Test end time 1:00 pm 1:00 pm <br /> 16. Test period 1 hour 1 hour <br /> 17. Level chane 0 0 <br /> Test results: ®Pass ❑Fail 9 Pass ❑Fail E Pass ❑Fail E Pass ❑Fall ❑Pass ❑Fall ❑Pass ❑Fail- <br /> Pass/fail criteria:Must pass visual inspection.Hydrostatic:Water level drop of less than 1/8 inch;Vacuum single-walled only; <br /> Maintain at least 26 inches water column;Vacuum double-walled;maintain at least 12 inches water column. <br /> Comments: <br /> *All liquids and debris must be disposed of properly. <br /> Testing company CGRS <br /> name: �� � °^�°° �•^°° Tester's name: Garrett Warren <br /> Date : 1/14/2020 Tester's signature: <br /> GPH=Gallons per hour,Y=Yes,N=No,NA=Not applicable,VPH=Vacuum/Pressure/Hydrostatic,ID=Identification <br />