My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 9:44:23 AM
Creation date
7/7/2020 2:10:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XIII. LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section.) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? El El El <br /> all that apply.) Simulated leak rate verified: N 3 GPH El 0.1 GPH El 0.2 GPH <br /> Was the testing apparatus properly calibrated? E ❑ ❑ <br /> For emergency generator tank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ N <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? E ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? N ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? N ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? E ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? E ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? N ❑ ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? N ❑ ❑ <br /> For any answer of"N"above,describe in section Xlll how and when these issues were or will be corrected. <br /> XIV. COMMENTS <br /> This station has three Veeder-Root electronic leak detectors for the 87A, 876, and 91 tanks. <br /> This station has one FePetro mechanical leak detector for the aboveground additive tank. <br /> XV. VACUUM/PRESSURE/HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑ Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) E Vacuum ❑ Pressure E Hydrostatic <br /> Sensor Functionality Interstitial Communication <br /> Sensor ID Component(s)Monitored by this Sensor Test Test <br /> S09 87A PRODUCT I INF ®Pass ❑Fail N Pass ❑ Fail <br /> S10 87A VAPOR LINE ®Pass ❑Fail E Pass ❑ Fail <br /> S11 87A VENT LINE ®Pass ❑Fail E Pass ❑Fail <br /> S12 87B PRODUCT I INE ®Pass ❑Fail N Pass ❑ Fail <br /> S13 87B SYPHON LINE E Pass ❑ Fail I E Pass ❑ Fail <br /> S14 87 VENT LINE N Pass ❑ Fail N Pass ❑ Fail <br /> S16 AT P SENSOR N Pass El Fail N Pass ❑ Fail <br /> S17 91 PRODUCT LINE N Pass ❑ Fail N Pass ❑ Fail <br /> S18 91 VENT LINE E Pass ❑ Fail E Pass ❑ Fail <br /> S23 ADDITIVE PRODUCT LINE E Pass ❑ Fail N Pass ❑ Fail <br /> S24 ADDITIVE VENT E Pass ❑ Fail E Pass ❑ Fail <br /> Li 87A TANK ANNULAR BRINE E Pass ❑ Fail E Pass ❑ Fail <br /> L2 87B TANK ANNULAR BRINE E Pass ❑ Fail N Pass ❑ Fail <br /> U 91 TANK ANNULAR BRINE N Pass ❑ Fail N Pass ❑ Fail <br /> -1-4 91 TANK ANNULAR BRINE N Pass ❑ Fail N Pass ❑ Fail <br /> L5 87A TURBINE SUMP BRINE N Pass ❑ Fail E Pass ❑ Fail <br /> L6 87A FILL SUMP BRINE N Pass ❑ Fail N Pass ❑ Fail <br /> L7 87B TURBINE SUMP BRINE E Pass ❑ Fail E Pass ❑ Fail <br /> L8 UNLEADED VENT BOX SENSOR BRINE E Pass ❑ Fail E Pass ❑ Fail <br /> L9 87B FILL SUMP BRINE E Pass ❑ Fail N Pass ❑ Fail <br /> L10 91 TURBINE SUMP BRINE E Pass ❑Fail E Pass ❑ Fail <br /> 1-11 91 FILL SUMP BRINE ®Pass ❑ Fail N Pass ❑ Fail <br /> L12 UNLEADED VENT BOX BRINE E Pass ❑ Fail E Pass ❑ Fail <br /> L13 ADDITIVE STP SENSOR E Pass ❑ Fail E Pass ❑ Fail <br /> L14 I ADDITIVE STE SENSOR BRINE E Pass ❑ Fail E Pass ❑ Fail <br /> 15 1 ADDITIVE VENT BOX SENSOR BRINE N Pass ❑ Fail N Pass ❑ Fail <br /> L16 ADDITIVE VENT BOX BRINE ®Pass ❑ Fail E Pass ❑ Fail <br /> E Pass ❑ Fail E Pass ❑ Fail <br /> 1-23. L24 DISP 5&6 BRINE, DISP 7&8 BRINE E Pass ❑ Fail I ® Pass ❑ Fail <br /> L25, L26 DISP 9&10 BRINE, DSP 11&12 BRINE E Pass ❑ Fail E Pass ❑ Fail <br /> L27. L28 DISE 13&14 BRINE, DISE 15&16 BRINE E Pass ❑ Fail E Pass ❑ Fail <br /> How was interstitial communication verified? E Simulated leak at far ends of the interstitial space. E Visual Inspection <br /> ❑Other(Describe the method in section XV below.) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? E Yes ❑No(Describe the reason in section XV below.) <br /> For any answer of"FAIL"above,describe in section XV how and when these issues were or will be corrected. <br /> XVI. COMMENTS <br /> GPH=Gallons per hour,Y=Yes,N=No,NA=Not applicable,VPH=Vacuum/Pressure/Hydrostatic,ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.