My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 9:09:48 AM
Creation date
7/7/2020 3:48:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM ( Page 4 of 6) <br /> XIII . VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A ❑ I B ❑ C I D ❑ <br /> A ❑ B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑ Industry Code or Engineering Standard (Specify): <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vapor Recovery Piping Containment Testing Training and Certifications (List applicable certifications) Expiration Date <br /> Interstitial Communication Verification Method Used : <br /> XIV. COMMENTS <br /> Provide any additional comments here. <br /> Single Wall Vapor Recovery Piping at this UST Facility. <br /> XV. TURBINE / PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Total Containment/Polymer Plasti A 0 I B ❑X C D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used : El Manufacturer Guidelines (Specify) : <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> 0 Engineered Method (Specify) : Caldwell Systems/Level Change Indicator <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Turbine / Product Piping Sump Testing Training and Certifications (List applicable certifications) Expiration Date <br /> Caldwell Level Change Indicator 7/5/2020 <br /> I <br /> i <br /> i XVI . COMMENTS <br /> Provide any additional comments here. <br /> ID = Identification <br /> i <br /> E <br />
The URL can be used to link to this page
Your browser does not support the video tag.