Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page 4 of 6) <br /> Ville MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring, Y NNA <br /> Are the visual and audible alarms operational? Q [0:11 ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ® ❑ ❑ <br /> functionally tested and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? ® ❑ El <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ® ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ® Sump ® Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e .g . , modem) operational? 231 ❑ ❑ <br /> For any answer of "N" above, describe in Section lX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> Replaced TLS Battery for PM Purpose . <br /> X. IN-TANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control . (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed . (Do not complete this section.) YN NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally ® ❑ ❑ <br /> tested and confirmed operational? <br /> Was accuracy of system's product level readings tested? ® ❑ ❑ <br /> Was accuracy of system's water level readings tested? ® ❑ ❑ <br /> Were all probes reinstalled properly? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? ® ❑ ❑ <br /> For any answer of "N" above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> Y = Yes, N = No, NA = Not Applicable <br />