Laserfiche WebLink
1 <br /> Environmental Health Department <br /> SAN JOAOUIN Environmental Health Department SANJOADUIN <br /> I/l\SjulIfi°- Linda Turketter,RENS,Direetor —COUNTY-- <br /> Ke>y Foley,.."--,- <br /> PROGRAM COOROINATWS 5. Contact Shewh Woldearegay,EHS,at(209)468-0216 to strange the following Inspection <br /> Robes le—on,RENS appointments.All appointments must be scheduled 48 hours In advance. <br /> tae Creur.RENS.R01 a) Inspection of lank vacuum gauge or inspection for brine leaks poor to tank placement in <br /> Mid,z full RENS <br /> my No."E"" <br /> excavation.All tank pre-installation tests shall be performed according to lank manufacturer <br /> Munn—N4-0u.REHS instructions.The tank installation checklist must be submitted to EHO prior to the final inspection. <br /> Augi 12,201 B <br /> b) Verification of tank set anchorage,appropriate backfill,and appropriate additional cortosan <br /> Protection of tank anchors(turnbuckles.eye bolls,etc).Additional corrosion protection Is required <br /> MEL HIGGINBOTHAM on all exposed metal prior to covering <br /> PM DESIGN GROUP INC c) Primary tank test,according to manufacturer's specif:eahons,prim to ballasting the tanks. <br /> 6930 DESTINY DR.SUITE 100 <br /> ROCKLIN.CA 95877 d) Primary piping snap test of all piping and penetrations(product,vapor recovery,and vent):One- <br /> hour pneumatic pressure test at 110%of operating pressure,or 40 psi,whichever Is greater,In <br /> accordance with manufacturer installed-instructions <br /> RE:CSTORE Wf76 FUEL ISLAND SR0079417 e) Verification of secondary piping slope at 1)8 Inch per foot or greater,to a containment sump with <br /> 141 E.HARNEY LN.,LODI,CA 85240 an auditile/visual alarm <br /> The San Joaquin County Environmental health Department(EHD)has completed the review,of the application if Secondary piping soap test of all piping and penetrations(product,vapor recovery,and vent): <br /> for a par mit to install a Xerxes new underground storage tank(UST)System at the above noted address, One-hour pressure test at the manufacturer's recommended specification, <br /> which will consist of: g) Verification of all pipe setbacks,cross-avers,and burial depth according to the manufacturers <br /> TA05206/9 20,000 gallon regular gasoline Installatlon Instructions and verifu nm of appropriate piping backfill. <br /> TA0520850 12,000 gallon diesel(Split tank) <br /> TA0520851 8,000 gallon premium gasoline(split tank) h) Integrity testing of art sumps per the manufacturer's Installation instructions,prior to backfill. <br /> 1) Verification of brine type and witnessing of brine addition,prior to backfill <br /> The permit has been approved with the following conditions: j) Verification of leak monitoring communication for all installed vacuum,pressure,or hydrostatic <br /> (VPH)components Including piping,sumps,under dispenser containment Sumps(UDCs),and all <br /> 1. Contact the kcal Fire District,the San Joaquin Valley Air Pollution Control Disvict,and the local chase lines, Communication at end points of each vacuum zone and each vacuum monitored <br /> Community Development Department for applicable permitssump must ore verified independently in operating condition. <br /> 2. Any changes shall be submitted t0 the EHD for approval prior to commencing work,Including k) Verificallon of the dispenser footprints contained by the LOCI. Any putentral leaks from prong <br /> change in contractors,service technicians,Installer,etc. All new submittals supersede the and fuel liners must drain directly Into UDCs. <br /> previous ones. p Enhanced Leak Detection(ELD)testing,after facility ls In operating cond8ion. Appropriate lest <br /> notification,tester certifications,and test method disclosure Is required.Passing ELD test results <br /> J. Qualified Installers must possess or work under the direct and personal supervision Of an individual must be received prix to receiving hrel, <br /> Physically present It the worn site,at all times while work is being performed,who possesses Eli of <br /> the following m)Verification of VPH components installation(shroud boots and band clamps for spill containers, <br /> • One of Several permissible valid,current contractors licenses Issued by the Contractors State appropriate rutiber-type gasket or clamps on lids on all fill,vent and STP sumps,etc.). <br /> License Board(may be issued to the Installation company), n) Verification of overall prevention prior to first fuel delivery:Measurement of drop lubes to verify <br /> • A valid,current UST InstallalloniRetrofming certHlcate issued by the International Code Council 96%tank volume shut off and/or verification that external and ibleNisual alarm acerates when tank <br /> (ICC), .90%1.11, <br /> • A valid,current certfficale of training from the manufacturer(s)of the component(s)being <br /> installed of Spitbucket last,prior to brat Nal delivery:Verity minimum 5-gallon capacity and pass a ora hour <br /> hydrostatic test(or equivalent)Proper drainage named must be verified. <br /> 4. QualHled service technicians must possess or work under the direct and personal supervision of an p) Monitoring system functionality,prior to first fuel delivery:Functionality of the monitoring system <br /> individual physically prosent at the work site,at all times while work is being performed. A4 must be verified to ensure it meets the requirements of Calilomia Code of Regulations(CCR)Title <br /> P..—till of the following: 23 and Califomla Heats 8 Safety Code(HSC)Chapter 6.7. <br /> • One of several permissible vald,current contractor licenses issued by the Contractors State q) Leak detector test.eller first fuel delivery:Leak detects must be tested to confirm that the device <br /> License Board(may be Issued to the installation company), can detects look of 3 gallons per hour at 10 psi. Leak detector morntored line volumes shall be <br /> A valid,current California LIST Service Technician certificate issued by the International Code appropriate for the make and model of gee installed leak detectors,and shall be verified at the time <br /> Council(ICC), of installatgn. <br /> • A valid current cerliicate of training from the manufacturers)of me c t(s <br /> tested,repaired,or serviced. VI tem functionality,cher first hal delivery,in operating condition Functionality of the <br /> 11 E <br /> s g must be verified to ensure.t meets the requirements of CCR Title 23 and HSC <br /> 6.7. <br /> 1868E Hazelton Avenue/Stockton,California 952051 T 209 468-3420 1 F 2094840138 I <br /> www.Sjcehd.com 2 ora <br /> t� 1 2020 <br /> SAN;.JOANIN Environmenhl NjQNpe,6U0 N M E N TALC �I�� Environmental Health Department <br /> -COUNTY— DEPARTME TOUNTY- <br /> 6. A vats California Department of Tax and Fee Administration(CDTFA)number must be obtained and 18.Hazardous material or waste cannot be released,Intentionally or unintentionally,to the sower/septic <br /> Provided to EHD prior to fuel drop,end must be uploaded into CERS, system,slam water system,or any other waters of the state. If a release occurs,it will be considered <br /> illegal hazardous waste disposal and will be subject to enforcement. <br /> T The following Items must be completed prior to scheduling the final inspection: <br /> 19.A'Certifiation of InslabationlModificabon'form for installed tank systems shall be submieed into <br /> a. An accurate and drawn to scale as-0u91 drewnng,which indicates the location of the UST CERS by the owner or operator,pursuant t0 CCR 2635(d),before this UST installation will be <br /> system(underground storage tanks,piping.auxiliary and monitoring equipment)with respect considered complete by the EHD. <br /> to buildings or other landmarks,per CCR 2711(aH8),most be submitted to EHD. <br /> 20.All outstanding up-t"ate perms fes must be paid prior to receiving the final approval to operate. <br /> b. Copies of any required installation checklists(tank,etc)must be submitted to EHD. <br /> 21.This permR expires at the end of the calendar year.A request for extension to this permit must be <br /> c The designated operator(DO)training requirement must be Satisfied,per CCR 2715(f). received by December 31,2019 <br /> d. Submit to the California Environmental Reporting System(CERS)all applicable hEzardous <br /> materials,hazardous waste,and UST submittals.The submitW must be approved by EHD If you have any questions,please call are at(209)46811216. <br /> 8. The installed UST system must be compliant with all applicable laws regulations,and industry <br /> standards.All installation Guidance <br /> and testing shall be n compliance with manWacturefs instructions and CCR TryyrR <br /> 2635 and 2636 All monitoring system components shall be listed in the State Water Resources <br /> Control Board's Laval Gudance Letter(LG)113. <br /> 9 All primary containment including any integral secondary containment system must be certified by an <br /> independent tesbrg organization and Labeled as required by the organization(California Code of <br /> Regulations Tide 23 Chapter 16(CCR)2631(b),UL,ULC,ANSI,API,ASTM.etc See CCR Table B Stiewit Woklearegay <br /> lot complete list.).Pursuant b0 Underwriters Laboratories Inc.(UL)Irsting requirements,only those Environmental Health Specialist <br /> products bearing the UL mark will be considered listed ANY PARTIPRODUCT NOT MARKED WITH <br /> THE UL LABEL OR ANOTHER LISTED TESTING ORGANIZATION WILL BE REJECTED.All <br /> secondary containment system which is not an integral part of the primary containment shall be Cc:Chis Brown,PM Design Groups,INC-cOrowmDpinglaw.con <br /> designed and constructed according to an engineering specification approved by a state registered <br /> professional engineer or according to a nationally recognized industry code or engineering standard, Ornar Nasim,Facility Contact--unit—Oarmad.- <br /> M CCR 2631(d). <br /> Engel Moana,Contactor-.noel abort-8.1koo.- <br /> 10.All metal components in direct contact with Bre ground,such as flexible connectors,swing joints, <br /> fittings,clamps,hands,and pumps,shall have adequate corraskm protection <br /> 11.Install concrete of sufficient thickness over USTS and around Sumps and dispensers,according to the <br /> manufacturer's written Installation instructions and buoyancy calculations. <br /> 12.All tank top openings that are connected to the primary space of the UST must have secondary <br /> containment.audiblef-tial alarm,and be vapor tight or teninnater at grade. <br /> 13.Sumps,Including UDCs,must be constructed in a manner to prevent vapore from entering the backfill. <br /> 14.All secondary containment must be constructed b prevent water intrusion and must be continuously <br /> monitored as required under HSC 25290.1. <br /> 15.Chase piping must be VPH monitored and included in its respective product piping vacuum monitoring <br /> zone.All vacuum zone volumes must be accurately programmed and their volumes adequate for Meir <br /> respective vacuum Sensors.All sensors must be installed to detect a leak at the earliest opportunity. <br /> 15.All appropriate test ports must be Installed to facilitate frequent routine communication testing(ag.at <br /> the beginning and end of each vacuum zone bench and inside brine filled sumps).No adddional Shut <br /> off valves should be installed between the monitored interstitial spaces and their respective sensors. <br /> 17 Overfill prevention shall satisfy CCR 2635(b)(2)(C),pursuant to the permit application. No bait floats <br /> shall be installed on vent lines to comply with overfill prevention requirements(Code of Federal <br /> Regulations,Title 40,section 280.20(c)) <br /> 3v1+ 4ol4 <br />