Laserfiche WebLink
Hazardous Waste Tank System February <br /> Written Assessment per CCR Title 22 <br /> Jiffy Lube#387 Fulton Ave. Sacramento 2019 <br /> Inspection Notes <br /> Project IZOslelr <br /> Tank# <br /> Date of Inspection; <br /> Address- <br /> 4 <br /> am- ' <br /> Length; <br /> Width: <br /> Height" 44 <br /> Diameter; <br /> Tank Volume. <br /> Secondary Containment Dimensions: "� + <br /> Anchors; AA0k' <br /> Hazardous Characteristics of the Waste- <br /> Wank Mfg: 4#X4""" <br /> � <br /> Tank Configuration: �rr <br /> Material of Construction: <br /> Shell Thickness: � 5" <br /> Piping Material: , � <br /> Piping Diameter: <br /> Pump Discription; <br /> Design Standards & Calculations; <br /> Tank Foundation; <br /> Tank Floation; <br /> Tank Prost Heave: <br /> Tank System Age- <br /> Tank System Leak Detectiok ! a-,,. <br /> Tank System Corrosion Protection; <br /> Tank system Overfill and Spill Prevent Egwpment: <br /> Tank System Secondary Containment; � <br /> Tank System Descrepancies <br /> 77 <br /> Tanks System Estimated Remaining Service Life: <br /> Sketch on back of page: <br /> Strandberg Associates 1(866) 388-0404 rwaterguy(cD.rwaterguy.com A-1 <br />