Laserfiche WebLink
i <br /> 27 July 1998 <br /> AGE-NC Project No 95-0130 <br /> Page 5 of 5 <br />' • Continued utilization of wells VW-1, VW-2 and VW-3 for characterization of ground water <br /> conditions in the "core area" <br />' • Continued quarterly ground water monitoring The next quarterly monitoring and sampling <br /> is scheduled for September 1998 <br /> • Proceed with drilling activities outlined in the Work Plan Addendum -June 1998, dated 23 <br />' June 1998, upon regulatory approval <br />' 6.0. LIMITATIONS <br />' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory and a well casing elevation survey <br />' performed by an independent sub contractor Evaluations of the geologic/hydrogeologic conditions <br /> at the site for the purpose of this investigation were made from a limited number of available data. <br /> points (i a momtonng well ground water samples), and subsurface conditions may vary away from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> Advanced GeoEnvironmental,Inc <br />