My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012072
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
ARCHIVED REPORTS_XR0012072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:01:47 PM
Creation date
7/9/2020 8:38:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012072
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 03 July 2003 <br /> AGE-NC Project No 95-0130 <br /> iPage 6 of 6 <br /> monitor ground water impacts at these wells and should be re-evaluated on a semi-annual <br /> basis <br /> • Conduct future ground water monitoring events concurrently with the Knowles/Roek <br /> iProperty site(102 South Wilson Way) and the Arco AM/PM site(130 South Wilson Way), <br /> An `Interim Remediation Work Plan' was submitted to the SJCEHD on 21 May 2003 and approved <br /> by the SJCEHD by letter on 10 June 2003 Currently, AGE is in the process of preparing a cost <br /> estimate for the approved-interim remediation work plan, upon completion, the cost estimate will <br /> ibe forwarded to the UST Cleanup Fund for a cost pre-approval <br /> AGE has tentatively scheduled the drilling and installation of a ground water monitoring and two <br /> iground water extraction wells to commence at the site on 17 and 18 July 2003 <br /> i6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> iavailable data points (ground water samples), and subsurface conditions may vary away from these <br /> data points No other warranty,expressed or implied,is made as to the professional interpretations, <br /> opinions and recommendations contained in this report <br /> I <br /> I <br /> I <br /> I <br /> i <br /> i <br /> iAdvanced GeoEnvironmental,Inc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.