Laserfiche WebLink
I <br /> 03 July 2003 <br /> AGE-NC Project No 95-0130 <br /> iPage 6 of 6 <br /> monitor ground water impacts at these wells and should be re-evaluated on a semi-annual <br /> basis <br /> • Conduct future ground water monitoring events concurrently with the Knowles/Roek <br /> iProperty site(102 South Wilson Way) and the Arco AM/PM site(130 South Wilson Way), <br /> An `Interim Remediation Work Plan' was submitted to the SJCEHD on 21 May 2003 and approved <br /> by the SJCEHD by letter on 10 June 2003 Currently, AGE is in the process of preparing a cost <br /> estimate for the approved-interim remediation work plan, upon completion, the cost estimate will <br /> ibe forwarded to the UST Cleanup Fund for a cost pre-approval <br /> AGE has tentatively scheduled the drilling and installation of a ground water monitoring and two <br /> iground water extraction wells to commence at the site on 17 and 18 July 2003 <br /> i6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> iavailable data points (ground water samples), and subsurface conditions may vary away from these <br /> data points No other warranty,expressed or implied,is made as to the professional interpretations, <br /> opinions and recommendations contained in this report <br /> I <br /> I <br /> I <br /> I <br /> i <br /> i <br /> iAdvanced GeoEnvironmental,Inc <br /> i <br />