My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012080
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
ARCHIVED REPORTS_XR0012080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:08:06 PM
Creation date
7/9/2020 8:39:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012080
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E21 May 2003 <br /> AGE-NC Project No 95-0130 <br /> Page 7 of 16 <br />' should be adequate to address interim remediation efforts in the `core' area of the dissolved <br /> petroleum hydrocarbon plume, proposed ground water extraction well locations and results of the <br /> capture zone analysis are illustrated in Figure 3 AGE proposes installation of ground water <br /> extraction wells in the following locations <br /> • A six-inch diameter ground water extraction well (EW-1) screened between 30 and 55 feet <br />' bsg(Hydrologic Unit No 1)and located approximately 5 to 15 feet north of monitoring well <br /> MW-6, and <br />' • A six-inch diameter ground water extraction well(EW-2) screened between 30 and 55 feet <br /> bsg{Hydrologic Unit No ])and located approximately 10 to 20 feet northeast of well VW-2 <br /> IFollowing installation of ground water extraction wells EW-1 and EW-2,AGE will install dedicated, <br /> four-inch diameter Grundfos submersible pumps (model 5E5) inside each extraction well The <br /> pumps will be designed to operate continuously at low flow rates ranging between five and ten <br /> gallons per minute (GPM) Additional information for the proposed submersible pumps are in <br /> Appendix A <br /> I� <br /> 3 3 INSTALLATION OF INTERIM REMEDIATION SYSTEM PIPING NETWORK <br /> IA remediation system piping network will be installed underground in a 1%rfoot wide by a 1'/z-foot <br /> deep trench, the proposed trenching location is depicted in Figure 5, a cross sectional view of the <br />' trench is depicted in Figure 6 In the trench, two-inch diameter, schedule 80 PVC piping will be <br /> 1) manifolded from the well-heads at VW-1, VW-2, VW-3 and routed to the proposed vapor <br /> extraction unit,and 2)manifolded from the well-heads at EW-1 and EW-2 and routed to the ground <br /> I water treatment system Following piping placement, the trench will be backfilled with imported <br /> road-base sand, compacted and resurfaced with concrete <br />' Installation of a 20-foot wide by 40-foot Iong, chain-link, gated enclosure will be located in a <br /> southwest section of the site to secure the vapor extraction unit and the ground water treatment <br /> system The proposed remediation system fencing enclosure is illustrated in Figure 5 <br /> 34 PROPOSED INTERIM SOIL REMEDIATION SYSTEM <br />' TheY <br /> ro osed interim remediation SVE system will consist of a vacuum blower(Solleco Ecat 250) <br /> p P <br /> and a catalytic converter The two-inch diameter piping installed underground from the well-head <br />' at wells VW-1, VW-2 and VW-3 will be connected to the inlet of the vacuum blower, the outlet <br /> • from the vacuum blower will be routed through a catalytic converter Induced vacuum will measured <br />' Advanced GeoEnvironmental,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.