My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012080
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2900 - Site Mitigation Program
>
PR0541653
>
ARCHIVED REPORTS_XR0012080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:08:06 PM
Creation date
7/9/2020 8:39:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012080
RECORD_ID
PR0541653
PE
2965
FACILITY_ID
FA0023871
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125307
CURRENT_STATUS
01
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> I Interim Remediation Work Plan - May 2003 <br /> • TOP FILLING STATION <br /> 101 South Wilson Way, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 21 SITE DESCRIPTION 1 <br /> 2 2 REGIONAL GEOLOGY AND HYDROGEOLOGY 2 <br /> 23 UNDERGROUND STORAGE TANK REMOVAL 3 <br /> 24 PREVIOUS SUBSURFACE INVESTIGATION 3 <br /> i3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 31 PERMITTING AND PRE-FIELD WORK ACTIVITIES 6 <br /> 32 INSTALLATION OF REMEDIATION WELLS 6 <br /> 33 INSTALLATION OF INTERIM REMEDIATION SYSTEM PIPING NETWORK <br /> 7 <br /> 34 PROPOSED INTERIM SOIL REMEDIATION SYSTEM 7 <br /> 35 PROPOSED INTERIM GROUND WATER REMEDIATION SYSTEM 8 <br /> 36 INTERIM REMEDIATION START-UP PERIOD 8 <br /> 37 MONITORING AND MAINTENANCE 9 <br /> 38 REPORT PREPARATION 9 <br /> I4.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 41 PERMITTING 10 <br /> 42 DRILLING ACTIVITIES 10 <br />' 4 2 1 Drilling And Soil Sample Collection 11 <br /> 4 2 2 Ground Water Extraction Well Completion 11 <br />' 4 2 3 Ground Water Extraction Well Development 12 <br /> 43 REMEDIATION SYSTEM PIPING NETWORK 12 <br /> 44 SOIL VAPOR EXTRACTION SYSTEM DESIGN 13 <br />' 4 4 1 Soil Vapor Extraction Monitoring 13 <br /> 4 4 2 Soil Vapor Extraction System Maintenance 14 <br /> 45 GROUND WATER PUMP AND TREAT SYSTEM 14 <br />' 4 5 1 Ground Water Extraction 15 <br /> 4 5 2 Extraction Well And Process Pump Controllers 15 <br /> 4 5 3 Ground Water Extraction Start-Up Period 15 <br />' 4 5 4 Pump-and-Treat Monitoring and Maintenance Activities 16 <br /> . <br /> 46 REPORT PREPARATION 16 <br />' Advanced Geof nvironmental,Inc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.