Laserfiche WebLink
Well Installation Report - July 2003 <br /> • TOP FILLING STATION <br /> 101 South Wilson Way, Stockton, California <br /> TABLE OF CONTENTS <br /> i <br />' FIGURES <br /> Figure 1 -Location Map <br />' Figure 2 - Site Plan <br /> Figure 3 - Geological Cross Section B- B' <br /> Figure 4 - Geological Cross Section C- C' <br />' Figure 5 -Monitoring Well Design EW-1 <br /> Figure b -Monitoring Well Design EW-2 <br /> Figure 7 -Monitoring Well Design MW-8 <br />' Figure 8 -Hydrocarbon-Impacted Soil Plume Cross Section B-B' <br /> Figure 9 - Hydrocarbon-Impacted Soil Plume Cross Section C-C' <br />' TABLES <br />' • Table 1 -Analytical Results of Soil Samples <br /> Table 1 - f l Results o Analytical Soil Samples -23 & 24 July 2003 <br /> y <br /> Table 2 - Summary of Monitoring Well Details <br />' APPENDICES <br /> Appendix A - Boring Logs <br /> t Appendix B - Surveying Report -Mid Coast Engineers <br /> Appendix C -Analytical Results of Soil Samples <br /> 1 <br />