Laserfiche WebLink
15 November 2005 <br /> • AGE-NC Project No 95-0130 <br /> Page 10 of 10 <br /> 44 BORING DESTRUCTION <br /> All soil borings will be permanently sealed to prevent vertical migration of potential contaminants <br /> At the completion of CPT and ground water sampling activities, all CPT borings and sample soil <br /> borings will be backfilled by inserting hollow steel rods to total depth of each boring and backfilling <br /> with a portland cement grout mix, the EHD will be notified at least 48 hours in advance of field <br /> work and given the opportunity to inspect the grout mix prior to backfilling activities <br /> • <br /> Advanced GcoEnvironmental,Inc <br />