Laserfiche WebLink
26 September 1996 <br /> AGE-NC Project No 95-0130 <br /> Page 4 of 4 <br /> additional monitoring wells on the former Wells Fargo Bank property For the new wells, a minimum <br /> of 30 feet of screen is suggested to ensure that the ground water does not rise above the top of the <br /> screen intervals <br />' A Corrective Action Plan (CAP) was submitted to the PHS-EHD in March 1996 Feasibility testing <br /> performed at the site, indicated that a cost-effective method of ground water remediation will be in- <br /> situ air sparging(IAS), combmed with soil vapor extraction If soil and ground water remediation is <br /> required, we recommend the installation of the IAS/SVE system <br /> The next quarterly monitoring and sampling is scheduled for October 1996 <br /> 5 0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results pro-vided by an independent laboratory Evaluations of the geologic/hydrogeologic <br /> conditions at the site for the purpose of this investigation were made from a hmited number of <br /> available data points (i a borings, monitoring wells), and subsurface conditions may nary a-Nay from <br /> these data points No other warranty, expressed or implied, is made as to the professional <br /> recommendations contained in this report <br />