Laserfiche WebLink
Daily Inspection Log For Tank Systems <br /> ry_ By initialing in the box below I certify that I have conducted an inspection in accordance with 22 CCR Section 66265.195(a). <br /> <. Specifically this.inspection included inspection of the following items: <br /> 1) Overfill/spill control equipment <br /> 2) Aboveground portions of the tank system to detect corrosion or releases of waste <br /> 3) Data gathered from monitoring equipment and leak detection equipment to ensure that the tank system is being operated <br /> according to its design; <br /> 4) The construction materials and the area immediately surrounding the externally accessible portion of the tank system including <br /> secondary containment structures to detect erosion or signs of releases of hazardous waste. <br /> 5) For uncovered tanks,the level of waste in the tank,to ensure compliance with section 66265.194(6)(3). <br /> 6) Label-legible and complete <br /> Jan. Feb. Mar. Ann Mav June July Aug. Sep. Oct. Nov. Dec. <br /> 2 e: ® '....., <br /> 3 <br /> 4 'r <br /> fj5 <br /> 6 <br /> 7 P <br /> 8 <br /> 9 <br /> 10 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 1 <br /> 19 <br /> 20 �.r. <br /> 21 f} <br /> 22 <br /> 23 a <br /> 24 <br /> 25 <br /> 26 <br /> 27 t <br /> 28 , 01/ }. <br /> 29 "' <br /> 30 ft <br /> 31 <br /> Name of Person Responsible For Inspection: p Cl` JWp,V S-ran' Inspection Year: L�. <br />