My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009037
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
223
>
3500 - Local Oversight Program
>
PR0545813
>
ARCHIVED REPORTS_XR0009037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 1:06:08 AM
Creation date
7/9/2020 1:13:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009037
RECORD_ID
PR0545813
PE
3528
FACILITY_ID
FA0000713
FACILITY_NAME
RIPONA MARKET
STREET_NUMBER
223
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26106014
CURRENT_STATUS
02
SITE_LOCATION
223 W WASHINGTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORC Design Software for Grid Applications Using Slurry Infection US Version 31 <br /> i Regenesls Technical Support USA(949)366-8000, www regenesls com <br /> i Site Name Ripona Market <br /> Location Ripon CA <br /> Consultant MJK Assoc <br /> Site Conceptual Model/Extent of Plume Requiring Remedlation <br /> Width of plume(inlersecting gw flow direction) 20 It <br /> Length of plume(parallel to gw flow directvon) 30 11 600 sq It <br />' Depth to conlamrated zone 25 It <br /> Thickness of contaminated saturated zone 10 It <br /> NOmnal aquifer sod(gravel sand silty sand silt clay) silty sand <br /> Total porosity 03 Eff porosity 0 1 <br /> Hydraulic conductivity 05 fUday = f BE 04 cm/sec <br /> hydraulic gradient 0 0031 fvft <br /> Seepage velocity 5 5 fvyr a 0 015 fvday <br /> Treatment Zone Pore Volume i 800 ft' 13 466 gallons <br /> Dissolved Phase Oxygen Demand Contamnant Stoich (wVwt) ORC(lb) <br /> (OdiyilWal species that represent oxVen demand. Conc(mg/L) Mass(to) 0,1contam (10%02) <br /> benzene 0 00 0 0 3 1 0 <br /> toluene GOO 0 0 3 1 0 <br /> ethylbenzene 0 00 0 0 3 2 0 <br /> xylenes 000 0 0 3 2 0 <br /> MTBE 0 45 0 1 2 7 1 <br />' drehloroethene 000 0 0 0 7 0 <br /> vinyl chloride 000 0 0 1 3 0 <br /> User added also add stomhlometnc demand 1 0 000 01 0 0 0 <br /> m <br /> User added also add sloichioelric demand 0 00 0 0 0 0 0 <br /> reduced metals Fe(+2)and Mri�2) 0 00 0 01 0101 0 <br /> Measures of total oxvaen demand <br /> Total Petroleum Hydrocarbons 0 00i 0 0i 3 1 0 <br /> Biological Oxygen Demand(BOD) 1 30001 341 11 34 <br /> Chemical Oxygen Demand(COD) 1 60001 6 71 1 67 <br /> Estimates for Sorbed Phase Oxygen Demand <br /> Sod bulk density 1-6-5-1 ekm' = 103 Iblcf <br /> Fraction of organic carbon foc 0 005 range 0 to 0 01 <br /> (Estimated using Soil Conc=foc Koc Cgw) <br /> (Adjust Koc as nec to provide realistic est) Koc Conlananant Stolch ORC(lb) <br /> Inamdual sged2s that regrgsent o4ygen demand (L tkg) Conc(mg/kg) Mass(lb) Oicontam (10%02) <br /> benzene 83 000 0 0 31 0 <br />' toluene 135 000 0 0 3 1 0 <br /> ethylbenzene 95 000 0 0 3 2 0 <br /> xylenes 240 000 0 0 3 2 0 <br /> MTBE 12 003 0 0 2 7 0 <br /> dichioroethene BD 000 0 0 0 7 0 <br /> User chloride 2 5 000 0 0 1 3 0 <br /> User added also add stolchlometnc demand0 000 0 T01 — <br /> 0 0 0 <br /> User added also add stoichiometric demand 0 00 0001 0 0 0 0 0 <br /> Measures of total oxvoen remand <br />' Total Petroleum Hydrocarbons _,_W78J 0001 0 Oi 3 1 0 <br /> Biological Oxygen Demand(BOD) Use a multiple of dissolved phase > 1 00 341 1 34 <br /> Chemical Oxygen Demand(COD) Use a multiple of dissolved phase > 1 00 6 71 1 67 <br /> ORC for Dissolved ORC for Sorbed Add Dem Factor ORC Total wt ORC Cost at <br /> Summary of Estimated ORC Requirements Phase(lbs) Phase lbs 1 to 10x} Add Dem Factor S 10 00 <br />' individual Species Total BTEX MTBE r 1 1 0 5 1 9 $ 91 <br /> Total Petroleum Hydrocarbons t 2 $ <br /> Biological Oxygen Demand(BOD) {' 34 1 34 1 2135 S 1 347 <br /> Chemical Oxygen Demand(COD) r 67 6 1 135 $ 1 347 <br />' Select above measure(button)to specify required ORC quantity fin 30 lb lncrements) �---> 30 pounds ORC <br /> Delivery Design for ORC Slurry <br /> Spacing within rows(ft) 10 0 feet Slurry Mixing Volume for Injections <br /> #points per row 2 pnirxal Pounds per locauon 30 <br /> Spacing between rows(ft) 10 0 n Buckets per location 1 0 <br /> #of rows 3 m 8 Design solids content(20 40%by wt for injections) 3070 <br /> Advective travel time bet rows(days) 667 days Volume of water required per hole(gal) 8 <br /> Number of points in grid 6 points Total water for rnxing alt holes(gal) 50 <br /> Required ORC per toot Minimum Dose Override 3 0 Wmt Simple ORC Backfilling min hole dia for 67%slurry 2 9 <br /> Total ORC Minimum Dose Override 1 180 Ids or ORC Feasibility for slurry injection in sand ok up to 15 1b/ft ok <br />' Feasibility for slurry injection in silt ok up to 10 Iblftok <br /> Prolect Aurnmary Feasibility for slurry injection in clay ok up to 5 IbIt ok <br /> ORC bulk material[or slurry injection(Ibs) 160 <br /> Number of 30 lb ORC buckets 6 0 <br /> ORC bulk material cost S 11 00 <br /> Cost for bulk ORC material S 1980 <br />' Shipping and Tax Estimates In US Dollars <br /> Sales Tax rate 0% $ <br /> Total Mall Cos( S 1980 <br /> Shi in call for amount S <br /> Total Ra enesis Material Cost $ 1,980 <br /> QRC I rry injection Cost Est,fresponsi�ilily of customer to contract work) Other ProE9Ct Cost Estimates <br /> Footage for each inj point=uncontaminated+HRC inj Interval f(t) 35 Desiqrl t <br /> Total length for direct push for project(fl) 210 Perrrwlling and reporting 5 <br /> Estimated daily installation rale(ft per day 400 for push 150 for drilling) 400 Construction management $ <br />' Estinlaled points per day(15 to 30 is possible for direct push) 11 4 Groundwater mlonitei ung and rpls S <br /> Re wired number of da s 1 Other S <br /> Mobldeinob cost for injection subcontractor S Other S <br /> Daily rale for inj Sub ($1 2K for push$3 4K for drill ng) $ Other <br /> TotalIn ectlon subcontralor cost forapplication $ Other S <br /> Total Install Cost inot including consultant lab etc 1 980 ITotal Pro ect Cost $ 1 98D <br />' 1 Regamstsxls 11112004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.