Laserfiche WebLink
25 Eating,Drinking,Smoking <br /> Eating,drinking,and smoking shall be allowed only in the designated areas in the support zone No personnel <br /> may eat,drunk,or smoke on site in arty other area except as permitted by the SSO <br /> 26 Safety Plan Acknowledgment Sheet <br /> All personnel visiting or working at the site shall read and certifN to reading thus SSP by appropriately <br /> completing the Safet• Plan Ackno%A ledgment Sheet(Page 9)attached to thus plan <br /> 30 EMERGENCY CONTINGENCY PLAN <br /> Should ant situation or unplanned occurrence require outside or support services, the appropriate contacts from the <br /> following lust should be made <br /> -Project Manager <br /> -Client Protect Coordinator <br /> -Police/Shenffs Department <br /> -Ambulance <br /> -Hospital <br /> 31 Emergency Conditions <br /> In the event an emergency develops on-site,the procedures delineated herein are to be immediately followed <br /> Emergenc% conditions are considered to exist if <br /> - Any member of the project is involved in an accident or experiences anN adverse effects of <br /> symptoms of exposure while on site <br /> - A condition is discovered that suggests the existence of a situation more hazardous than <br /> anticipated <br /> 32 EmergencN Procedure% <br /> In the event of an emergency, the following emergency procedures should be followed Personnel on site <br /> should use the "buddy" system (pairs) Buddies should prearrange hand signals or other mean of <br /> communication In emergencies the following hand signals are suggested <br /> - Hand gripping throat out of air,can't breathe <br /> - Grip partner's wrist or place both hands around waist leave area immediateIN,no debate, <br /> - Hands on top of head need assistance <br /> - Thumbs up OK,I'm all right,I understand <br /> - Thumbs down No,negative <br /> Site work areas entrance and exit routes wil] be planned and emergency escape routes delineated by the <br /> Project Manager These routes will be shown to all on-site personnel by the SSO <br /> Visual contact will be maintained between"pairs"on site with the team remaining in close proximity in order <br /> to assist each other in case of emergencies <br /> In the event that any member of the field crew experiences any adverse effects or symptom of exposure while <br /> on-site,the entire field crew should immediately halt work and act according to the instructions provided by <br /> the PSO <br /> Wind indicators visible to all on-site personnel will be provided by the Project Manager to indicate possible <br /> routes for upwind escape <br /> The discovery of any condition that would suggest the existence of a situation more hazardous than <br /> anticipated, should result in the evacuation of the field team and re-evaluation of the hazard and the level of <br /> protection required <br /> In the event that an accident occurs, the PSO is to complete an Accident Report Form for submittal to the <br /> Project Manager,Client Project Coordinator,and M J Kloberdanz&Associates office <br />