Laserfiche WebLink
' p 'f � �-�� <br /> Re ort# Field Log I Groundwater Sampling Form Date <br /> Client M.J. Kloberdanz & Associates Well Name 41 b <br /> Project Name Ripcna - Quarterly Well Type:❑Monitor Cl Extraction❑Other <br /> +C"onsultant Mike Kloberdanz <br /> Proj. Manager Rich Chr m Sampler Rich Cheri/Ray Azevedo <br /> 4 <br /> r <br /> Purge Method Purge Volume <br /> iler-Type Multiplier Well Casing Diameter Well Volume Purged <br /> Pump-Type 2 _ inch 3 vOltums <br /> Other Well Casing 4 incl 4 volumes <br /> I.D. Gal/Ft. other other <br /> } Total Well Depth =� 0.1632 <br /> Depth to Water 4.0 0.6527 Actual Values <br /> R a 6.0 1.4686 <br /> Water Column Length Purge Time Nol. <br /> �..� X .1632 X 3 = _ f ��z_ No. Volumes 3 <br /> Water column length Multiplier No.Volumes CALCULATED. Purge Vol. <br /> Total Purge Time <br /> f Y3/ 2.5 = X <br />�. Pure Vol Purge Rate TOTAL PURGE TIME Purge Rate <br /> / 3 ! Actual Purge Vol. <br /> Total Purge Time # Volumes PURGE TIME/VOL. <br /> WA IN <br /> Time Gallons ]7-H Conductivity Tamp- 'Turbidity Color / Odor <br /> gmhos/an ❑deg C ❑deg F NTU <br /> Start - <br /> Vol 1 <br /> Vol 2 <br /> Vol 3 `7.. <br /> Vol 4 ;Z T j. <br /> Vol 5 5 tel A7.!-7 �,. <br /> Not � c <br /> Meter , ia orage / Disposal <br /> DzIm-ed cnsite <br /> Onsite Treatment= Syst=em <br /> Other <br /> CC1TlS/Purge: <br /> `' I'' <br /> Sanpling Method <br /> Bailer-Type <br /> Pump-Type 2 <br /> Other o <br /> t Time Sample ID Org Dup Split Blank Container Type Number of Preservative <br /> Containers <br /> r 4 4degrees C <br /> I ; CAT'S/sampling: <br /> E' <br />(� 1405 Kansas Ave. GeoAnalytical Laboratories, Inc. Phone: (209)572-0900 <br /> I Modesto,CA 95351 Cert# 1157 Fax: : (209)572-0916 <br /> I <br />